Utility Installation Sample Clauses

The Utility Installation clause outlines the responsibilities and procedures for installing essential utility services, such as water, electricity, gas, or telecommunications, on a property or project site. It typically specifies which party is responsible for arranging and paying for the installation, the required standards or approvals, and any coordination needed with utility providers. This clause ensures that all necessary utilities are properly installed and operational, thereby preventing delays and disputes over utility access during or after construction.
POPULAR SAMPLE Copied 3 times
Utility Installation. Other please describe: Please list banks with whom you conduct business. Yes No Do you grant the Engineer permission to contact this (these) institutions? Respectfully Submitted: Signature: Date: Printed Name: Title: Street # and name City/Town State ZIP [Signed Name] Being duly sworn, deposes and says that they are [Position Title] of [Organization] and all the answers to the foregoing questions and all statement contained therein are true and correct. Sworn to before me this day of , , Notary Public My Commission Expires Seal Attest:
Utility Installation a) Any utility installation work, engineering and management (i.e., water, electricity and air-conditioning) must be handled by an Exhibition Hall-contracted utility installation service company. The renter should submit a demand checklist for utility work needed for all of their booths. The checklist should include electrical specifications (i.e., voltage output, electricity consumption, electricity boxes and switch numbers), quantities of water (including quantity of water supply valve boxes) and volumes of compressed air to be used per booth. And upon validation by the renter confirming the required specifications on the checklist, the renter should hand the checklist over to the said utility installation service company, and this will be submitted 15 days prior to any utility work specified in the checklist to TAITRA for review and approval. Once work has been undertaken, the utility installation service company will report directly to the renter for any development in their ongoing work. In case of an accident (due to poor quality material or equipment; inadequate engineering or piping installation) resulting in property damage to the Exhibition Hall or third-party casualty, the renter and their contractor will take sole responsibility for any compensation and/or legal liability. b) Electricity bills due all exhibitors should be collected by the renter (organizer). ▇▇▇▇▇▇ will only collect metered electricity and water charges during the rented period (i.e., periods from setup to exhibition and dismantling). c) In the event that the renter or their exhibitors will require setting up of a receptive antenna for the event, the renter or their exhibitors should request in advance to obtain permission from TAITRA in addition to applying for a permit from the authorities concerned before any installation/construction can begin. Any accrued costs based on a specific location and along a specific route will to be borne by the renter. Removal and restoration of lines and equipment at the end of the event will be the sole responsibility of the renter. d) In case of a power disruption occurring over 24 hours due to failure of the Taiwan Power Company to deliver electricity to the venue, or sudden failure of the Exhibition Hall's power facility, TAITRA will not be responsible for any damage and compensation. e) In case of any requirement for installation of telecommunication lines, the renter or their exhibitors should apply with the Chunghwa Telecom Co., Ltd. an...
Utility Installation. Sec. 94-83 – Technical and Construction Requirements, “The Department of Public Works shall provide details for technical and construction requirements, which each applicant must be in compliance.” ▇▇▇▇▇://▇▇▇▇▇▇▇.▇▇▇▇▇▇▇▇.▇▇▇/md/ocean_city/codes/code_of_ordinances?nodeId=PTIICOOR_CH94UT_ ARTIVUTIN_S94-83TECORE
Utility Installation. The Lessee, at its sole cost and expense, shall determine the availability of, and shall cause to be installed in, on, and about the Land, all facilities necessary to supply thereto all water, sewer, gas, electricity, telephone, and other like services required in the Lessee’s operations hereunder. The Lessee shall pay all connection or acreage assessments or charges levied by any public utility, agency, or municipality with respect to their services. Notwithstanding the foregoing, the Lessee shall not enter into any contract or agreement with any city, county, or other governmental agency or body or public utility with reference to sewer lines or connections, water lines or connections, or street improvements relating to the Land without the prior written consent of the Lessor, which consent shall not reasonably be withheld.
Utility Installation. Licensee shall comply with all relevant legal requirements for connecting its equipment to electricity and telecommunications service. The Township is not responsible for providing electricity or transport connectivity to Licensee.
Utility Installation. Lessee shall be the Insuring Party with respect to the insurance required by this Paragraph 8.4 and shall provide Lessor with written evidence that such insurance is in force.
Utility Installation. Shape the trench bottom to ensure uniform contact with the full length of the installed line and remove any sharp-edged materials that might damage the line. Compaction shall be maintained beneath the line.
Utility Installation. The pipe was put on the barge and any connections were made above water, and then was lowered into the creek and put in place by trained divers from a third party construction diving company. This was done by securing the pipe to a backhoe using steel chains and lowering down into the trench. There are special attachments that can be bought for lifting these materials, but these can be expensive and the maneuverability of using steel chains was another important factor in the method because the divers had to be able to easily place the pipe into place and release from the lifting equipment. The subcontractor company was used to using divers and had all of the certification required, experience working with the CM, and the procedures and experience to install the pipe safely. This included daily checklists to inspect the air tanks and other equipment, and using trained dive tenders on the barge with each diver to monitor air and the safety of the diver. The sub contactor had to abide by all of the CM’s safety procedures, which included submitting a site specific safety plan, completing JSA’s when starting any new task, and weekly safety meetings and toolbox talks.
Utility Installation. 7 --------------------
Utility Installation. Landlord agrees that it will cause to be made available to Tenant, stubbed to within five feet of the perimeter of the Building Pad, facilities for the delivery to the Premises of water, power, electricity, gas and telephone service, and for the removal of sewage from the Premises, in the capacities specified, and in accordance with the plans to be provided as specified in Exhibit "C." Such utilities shall be separately metered. Tenant agrees to use such utilities in connection with the use of the Premises.