Carried Forward to Summary Sample Clauses

Carried Forward to Summary. Item Description Unit QTY Rate Total 2.1 24 core Rodent Proof Optical Fibre cable km 65 R R 2.2 Supply standard patch panel for a 24 core fibre optical cable Each 14 2.3 Supply standard patch panel for a 12 core fibre optical cable Each 12 2.4 Manholes Each 35 2.5 Supply Cable sleeves 110mmx6m Each 15 2.6 Machinery to drill under 9 x 60m wide taxiway and laying of duct Sum 1 2.7 Dome connectors Sum 1 2.8 Fibre optic patch cord Sum 1 2.9 Fibre optic pig tails Sum 1 Sub-Total 2: Carried Forward to Summary R Item Description Unit QTY Rate Total 3.1 Provisional Sum: Location and protection of existing underground services and route assessment. Sum 1 R650 000 R650 000 3.2 Provisional Sum: Issuance of construction drawings and setting out the works with provision GIS coordinates Sum 1 R950 000 R950 000 3.3 Excavate, laying cable sleeves, back filling and compacting soft soil Cubic meter 65 3.4 Installation of manholes sum 1 3.5 Fibre installation, splicing and installation of dome connectors Sum 1 3.6 Drilling under 9 x 60m wide taxiways Sum 1 3.7 Testing and commissioning Sum 1 3.8 As-built Documentation Each 2 Sub-Total 3: Carried Forward to Summary R Item Description Total 1 Sub-Total 1: Preliminary and General R 2 Sub-Total 2: Material Supply and Accessories R 3 Sub-Total 3: Installation and Commissioning R 4 Total (Sub-total 1 + Sub-total 2 + Sub-total 3) R 5 Contingencies at 10% R 6 TOTAL Carry over to Form of Offer and Acceptance R 7 VAT at 15% Carry over to Form of Offer and Acceptance R GRAND TOTAL Carry over to Form of Offer and Acceptance R ORTIA O R Tambo International Airport AWOS Automated Weather Observation System ILS Instrument Landing System AGL Airfield Ground Lighting A-SMGCS Advanced Surface Movement Guidance and Control System ATC Air Traffic Control ICAO International Civil Aviation Organization COC Certificate of Conformance dB decibel GPa gigapascal IEC International Electrotechnical Commission ISO International Organization for Standards ITU International Telecommunications Union MMF Multi-Mode Fibre OTDR Optical Time Domain Reflectometer FRI Radio Frequency Interference UV Ultraviolet SMF Single Mode Fibre RFN Receptor Fibre Network LOC Localizer GP Glide Path
Carried Forward to Summary of Section No. 3 R Section No. 3
Carried Forward to Summary. Item No Description Unit Quantity Rate Amount SECTION No. 2 BILL NO. 1 ALTERATIONS (PROVISIONAL) Note: Tenderers are advised to study the "Model Preambles for Trades 2008" before pricing this schedule as issued by the Association of South African Quantity Surveyors and any amplification/s stated hereunder Note: Unless otherwise stated herein, all items in the Bill shall be deemed to be a fixed price for the duration of this project View site The tenderers are required to familiarise themselves on site with the dimensions, material and work required in order to price each item correctly in this bill of quantities Before submitting his tender the tenderer shall visit the site and satisfy himself as to the nature and extent of the work to be done and the value of the materials salvageable from the alterations. No claim for any variations of the contract sum in respect of the nature and extent of the work or of inferior or damaged materials will be entertained General The contractor shall carry out the whole of the works with as little mess and noise as possible and with a minimum of disturbance to tenants in the building and to adjoining premises and their tenants. He shall provide proper protection and provide, erect and remove when directed, any temporary tarpaulins that may be necessary during the progress of the works, all to the satisfaction of the principal agent Doors, fanlights, windows, fittings, frames, linings, etc which are to remain the property of the employer shall be carefully taken out, temporarily stored, transported to the stores and handed over to the employer Doors, fanlights, windows, fittings, frames, linings, etc which are to be reused shall be thoroughly overhauled before refixing including taking off, easing and rehanging, cramping up, re-wedging as required and making good cramps, dowels, etc, and oiling, adjusting and repairing ironmongery as necessary, replacing any glass damaged in removal or subsequently and stopping up all nail and screw holes with tinted plastic wood to match timber, unless otherwise described. Re-painting or re-varnishing is given separately Prices for taking out of doors, windows, etc shall include for removal of all beads, architraves, ironmongery, etc Prices for taking out and removing doors and frames shall include for removing door stops, cabin hooks, etc
Carried Forward to Summary of Schedules Total
Carried Forward to Summary of Section No. 1 R Section No. 1 Item No Quantity Rate Carried Forward R Amount Brought Forward R Multiple procurement Carried Forward R Brought Forward R
Carried Forward to Summary. Bill No. 1 Preliminaries SANSA Building Works 2002Q006 - Provisional Bills of Quantities R Unless otherwise stated herein, all items in this Bill shall be deemed to be a fixed price for the duration of this project.

Related to Carried Forward to Summary

  • Carry Forward to a Subsequent Year If you do not withdraw the excess contribution, you may carry forward the contribution for a subsequent tax year. To do so, you under-contribute for that tax year and carry the excess contribution amount forward to that year on your tax return. The six percent excess contribution penalty tax will be imposed on the excess amount for each year that it remains as an excess contribution at the end of the year. You must file IRS Form 5329 along with your income tax return to report and remit any additional taxes to the IRS.

  • Adjustment of Minimum Quarterly Distribution and Target Distribution Levels (a) The Minimum Quarterly Distribution, First Target Distribution, Second Target Distribution, Third Target Distribution, Common Unit Arrearages and Cumulative Common Unit Arrearages shall be proportionately adjusted in the event of any distribution, combination or subdivision (whether effected by a distribution payable in Units or otherwise) of Units or other Partnership Securities in accordance with Section 5.10. In the event of a distribution of Available Cash that is deemed to be from Capital Surplus, the then applicable Minimum Quarterly Distribution, First Target Distribution, Second Target Distribution and Third Target Distribution, shall be adjusted proportionately downward to equal the product obtained by multiplying the otherwise applicable Minimum Quarterly Distribution, First Target Distribution, Second Target Distribution and Third Target Distribution, as the case may be, by a fraction of which the numerator is the Unrecovered Capital of the Common Units immediately after giving effect to such distribution and of which the denominator is the Unrecovered Capital of the Common Units immediately prior to giving effect to such distribution. (b) The Minimum Quarterly Distribution, First Target Distribution, Second Target Distribution and Third Target Distribution, shall also be subject to adjustment pursuant to Section 6.9.

  • What Forms of Distribution Are Available from a ▇▇▇▇▇▇▇▇▇ Education Savings Account Distributions may be made as a lump sum of the entire account, or distributions of a portion of the account may be made as requested.

  • How Are Contributions to a ▇▇▇▇ ▇▇▇ Reported for Federal Tax Purposes You must file Form 5329 with the IRS to report and remit any penalties or excise taxes. In addition, certain contribution and distribution information must be reported to the IRS on Form 8606 (as an attachment to your federal income tax return.)

  • REQUIRED FOR PART 2 JOC - PRICING OF Regular Hours Coefficient What is your regular hours coefficient for the RS Means Price Book? (FAILURE TO RESPOND PROHIBITS PART 2 JOC EVALUATION)