Employer’s Objectives Clause Samples

Employer’s Objectives. The Employer’s objective in entering into a framework agreement over a five-year term, on an as and when instructed basis, is to secure the services on a full-time basis of a suitably qualified specialist project / Civil & Structural Engineering Consultant to serve the Employer’s needs and requirements in the construction of new infrastructure on its Thohoyandou Campus. A written instruction will be given to the appointed Consultant as and when their services is required. The panel shall be managed in terms of fairness and equitability when assigning projects/tasks, as such allocation of work shall be distributed based on quality of performance to date.
Employer’s Objectives. The Employer’s objective in entering into a framework agreement over a five-year term, on an as and when instructed basis, is to secure the services on a full-time basis of a suitably qualified specialist project/ Environmental Consultant to serve the Employer’s needs and requirements in the construction of new infrastructure on its Thohoyandou Campus. A written instruction will be given to the appointed Consultant as and when their services is required. The panel shall be managed in terms of fairness and equitability when assigning projects/tasks, as such allocation of work shall be distributed based on quality of performance to date.
Employer’s Objectives. The Employer’s objective is to appoint Contractors for the construction of primary bulk infrastructure for the Nqadu Corridor (one of five development corridors making up the KSD Presidential Intervention Bulk Water Supply Scheme. The Nqadu Corridor comprises two pipeline contracts (this Contract being one of these) and one reservoir Contract. The employer is desirous of awarding the contract as soon as possible. The award of contract will commence with the acceptance of the Notification of Award by the successful bidders. The signing of the selected formal contract will be finalized soonest after notification of award.
Employer’s Objectives. The Employer’s objective in entering into a framework agreement over a three year term, on an as and when instructed basis, is to secure the services of specialist professional access design service provider to serve the Employer’s needs and requirements in the construction of new infrastructure and the refurbishment, repurposing, rehabilitation or alteration of existing infrastructure on its ▇▇▇▇▇, Bisho and East London Campuses and Hunterstoun Centre.
Employer’s Objectives. The Employer’s objective is to rehabilitate runway 02/20, taxiways and aprons at ▇▇▇▇ ▇▇▇▇▇▇▇ International Airport to comply with the relevant recommended standards and practices in ICAO Annex 14. One of the objectives of the project is to train any of the following (occupational qualifications, trade qualification, work integrated learners – P1 and P2 learners, professional candidates) The Contractor shall provide opportunities to learners requiring structured workplace learning using one or a combination of any of the Skills Methods as agreed: accommodate Part/Full Occupational qualification (Method 1), Trade qualifications learners (Method 2),train Work Integrated Learners – P1 and P2 Learners (Method 3) and/or Professional Candidates (Method 4) as indicated in the cidb Standard and as agreed to by the Employer on this project (Employer to stipulate)
Employer’s Objectives. To install air condition system in order for the building to perform efficiently
Employer’s Objectives and Purpose of the Works Upon the start date, the Contractor studies the Employer’s Works Information, prepares and submits a detailed work methodology and draft Quality Control Plan (QCP) to the Project Manager, for each section of works, to obtain acceptance before each activity is started. The Contractor liaises with all the Employer’s project team such as engineers, quality controller/s, plant specialist/s etc. and requests clarification from the Project Manager immediately if any discrepancy or vagueness is discovered in the Works Information, which was not clarified during the tender period. The Contractor identifies all such discrepancies and vague areas of scope within the first twelve (12) weeks of the contract and submits them for further clarification to the Employer who reviews and provides decisions on those issues. The Supporting Factors for The System Upgrade The currently installed control air compressors are of an obsolete model. This has increased refurbishment costs and lead time for refurbishment (and critical spares). This has led to the deterioration of the reliability (and subsequently redundancy) of this plant. This has also led to multiple-unit trips (MUT) due to low control air pressure. The refrigerant dryer (auxiliary component to compressors) needs to change its refrigerant gas from hydro-chlorofluorocarbons (R22 gas) to an environmentally friendly alternative in line with government regulations. The desiccant dryer assemblies are problematic. These model dryers are rare and subsequently, there are few competent servicing options available. The Soft Starters used on the control air compressors are obsolete as well resulting in the unavailability of spares. The motors on Units 1 and 2 are obsolete and refurbishment is costly with poor performance. Address the issue of obsolescence of the control air compressors and dryer assemblies at Majuba Power Station. Ensure that Majuba Power Station has reliable compressors with OEM support for the equipment for the next 25 - 30years. The Contractor designs the new control air system as documented in Section 3, Engineering and the Contractor’s Design. The Contractor only starts with the procurement, manufacturing and fabrication process after the Contractor’s design was formally accepted by the Project Manager.
Employer’s Objectives. The objectives of the Employer are to To have a fully operational security infrastructure and technology at Klerksdorp RDC Approved plans where necessary Compliance to security infrastructure and technology regulations The work consists of double brick boundary wall, Barbed tape Coil (BTC) lining on top of the wall, Access control biometrics, guard house and automated gates The Contractor will construct temporary hoarding/fencing between the construction area and the adjacent occupied office space during refurbishment. Upon completion, the Contractor will remove the temporary hoarding structures.
Employer’s Objectives. The Employer requires a bulk point connection (substation) that will insure that the municipality has sufficient bulk electricity within the electrical networks in Vukuzakhe. It is the Employer's objective to construct electrical infrastructure network with bulk connection (metered electricity). The service provider is to access the requirements for providing the above mentioned services and make appropriate provisions in the design, schedule of quantities and construction. The Employer desires that the work required be executed on a turnkey basis, be of a high standard and be completed in the shortest practicable time whilst making use of local labour where possible. The contractor shall have successfully completed at least four (4) comparable contracts for electrical infrastructure networks in the last 10(ten) years as on the date of tender opening and shall be in successful operation.
Employer’s Objectives. The employer’s objective is to deliver a feature that celebrates the life of ▇▇▇▇▇▇ ▇▇▇▇▇▇ which acts as a focal element as you enter the ▇▇▇▇▇▇ ▇▇▇▇▇▇ National Botanical Garden.