Configuration Management The Contractor shall maintain a configuration management program, which shall provide for the administrative and functional systems necessary for configuration identification, control, status accounting and reporting, to ensure configuration identity with the UCEU and associated cables produced by the Contractor. The Contractor shall maintain a Contractor approved Configuration Management Plan that complies with ANSI/EIA-649 2011. Notwithstanding ANSI/EIA-649 2011, the Contractor’s configuration management program shall comply with the VLS Configuration Management Plans, TL130-AD-PLN-010-VLS, and shall comply with the following:
Procurement Requirements If the Sponsor has, or is required to have, a procurement process that follows applicable state and/or federal law or procurement rules and principles, it must be followed, documented, and retained. If no such process exists, the Sponsor must follow these minimum procedures: 1) Publish a notice to the public requesting bids/proposals for the project; 2) Specify in the notice the date for submittal of bids/proposals; 3) Specify in the notice the general procedure and criteria for selection; and 4) Sponsor must contract or hire from within its bid pool. If bids are unacceptable the process needs to be repeated until a suitable bid is selected. 5) Comply with the same legal standards regarding unlawful discrimination based upon race, gender, ethnicity, sex, or sex-orientation that are applicable to state agencies in selecting a bidder or proposer. Alternatively, Sponsor may choose a bid from a bidding cooperative if authorized to do so. This procedure creates no rights for the benefit of third parties, including any proposers, and may not be enforced or subject to review of any kind or manner by any entity other than the RCO. Sponsors may be required to certify to the RCO that they have followed any applicable state and/or federal procedures or the above minimum procedure where state or federal procedures do not apply.
Quality Management System Supplier hereby undertakes, warrants and confirms, and will ensue same for its subcontractors, to remain certified in accordance with ISO 9001 standard or equivalent. At any time during the term of this Agreement, the Supplier shall, if so instructed by ISR, provide evidence of such certifications. In any event, Supplier must notify ISR, in writing, in the event said certification is suspended and/or canceled and/or not continued.
Project Requirements 1. Project must conform to regulations under 24 CFR Part 92, commonly known as the HOME Regulations.
Access Toll Connecting Trunk Group Architecture 8.2.1 If Reconex chooses to subtend a Verizon access Tandem, Reconex’s NPA/NXX must be assigned by Reconex to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center subtends as identified in the LERG. 8.2.2 Reconex shall establish Access Toll Connecting Trunks pursuant to applicable access Tariffs by which it will provide Switched Exchange Access Services to Interexchange Carriers to enable such Interexchange Carriers to originate and terminate traffic to and from Reconex’s Customers. 8.2.3 The Access Toll Connecting Trunks shall be two-way trunks. Such trunks shall connect the End Office Reconex utilizes to provide Telephone Exchange Service and Switched Exchange Access to its Customers in a given LATA to the Tandem Verizon utilizes to provide Exchange Access in such LATA. 8.2.4 Access Toll Connecting Trunks shall be used solely for the transmission and routing of Exchange Access to allow Reconex’s Customers to connect to or be connected to the interexchange trunks of any Interexchange Carrier which is connected to a Verizon access tandem.