Control and Monitoring Sample Clauses

Control and Monitoring. Each Party shall provide or arrange for 24-hour control and monitoring of their portion of the Interconnection Facilities.
Control and Monitoring. As 8. 1.1 but also allows Engineers and/or the NMC to undertake a number of tasks remote from the transmission site such as switching, resetting, parameter adjustments, etc.
Control and Monitoring. As 8. 1.1 but also allows Engineers and/or the NMC to undertake a number of tasks remote from the transmission site such as switching, resetting, parameter adjustments, etc. Table 1 attached identify the SCADA service available at each transmission site. 3.1 shows a sample screen shot of the available information. This screen will provide visual indications on the status of each transmitter. The indicator will be “green” if the transmitter is on, “red” if it is off, or “yellow” if it is on reduced power.
Control and Monitoring. Each Party shall provide or arrange for 24-hour control and monitoring of their portion of the Interconnection Facilities. NYISO Tariffs --> Open Access Transmission Tariff (OATT) --> 35 OATT Attachment CC - Joint Operating Agreement Among And - -> 35.5 OATT Att CC Interconnected Operation
Control and Monitoring. As 8. 1.1 but also allows Engineers and/or the NMC to undertake a number of tasks remote from the transmission site such as switching, resetting, parameter adjustments, etc. Table 1 identifies the SCADA service available at each transmission site.
Control and Monitoring. The Laboratory commits to cooperate with ISRAC and to meet any requirement arising from accreditation matters, including but not limited to, assisting ISRAC in investigating and resolving complaints concerning the Laboratory. 3.1. The Laboratory commits to allow representatives or employees of ISRAC to perform Surveillance of the Laboratory and its premises, at any time during the operation of the Laboratory, and without prior notice under the security procedures to which it is bounded. 3.2. Prior to assessments or when needed, the laboratory undertakes to make available on loan, relevant standards, required for performing the assessment. 3.3. The Laboratory commits to assist ISRAC to the best of its ability in performing the Surveillance, including presentation, by request of ISRAC, of documents (and delivering copies thereof) of any kind as related to the issues of Surveillance and accreditation, preparation and testing of samples, allowing an opportunity to ask questions of employees, and presentation of any information that may be required by ISRAC, its representatives or its employees. In the event that security clearances are needed for presentation of information, ISRAC will act to produce them in accordance with the Laboratory’s request. 3.4. The Laboratory commits to assist ISRAC to the best of its ability in performing the Surveillance, subject to restrictions resulting from the Laboratory’s objective limitations, including as specified in the end of Article 3.3. 3.5. The laboratory shall have, where applicable, legal arrangements with its clients that commit the clients to provide, on request, access to assessment team to assess the laboratory's performance when carrying out testing/calibration activities at the client’s site. 3.6. The Laboratory commits to participate, at its expense, in proficiency tests. The Laboratory is committed to participate on its expense in expertise tests including inter labs comparison that will be edited by ISRAC as part of surveillance program. In case comparison test results will be published by ISRAC, laboratory name will be omitted.
Control and Monitoring a. Provide Workstations based upon manufacturer recommendations for requirements listed below and elsewhere within this document. b. Provide control and monitoring of all of PIDS on Perimeter Management System work station in the Command Post located in the ▇▇▇▇▇▇▇ Building, refer to drawings in RFP. c. Provide monitoring only of PIDS alarms in Guard Towers 1, 3, 4. d. Provide PIDS workstation in MDIU to monitor MDIU perimeter. MDIU PIDS workstation shall be located in the MDIU Control Room. e. Provide control and monitoring of the VSS of all perimeters on the Video Management System (VMS) workstation located in the Command Post in the ▇▇▇▇▇▇▇ building. f. Provide VMS workstation for monitoring of the cameras surveilling the MDIU perimeter. Workstation shall be located in the MDIU control room. g. Existing Duress System shall be monitored and controlled on the existing PIDS workstation in the ▇▇▇▇▇▇▇ Building Command Post. h. Provide rack mounted Network Video Recorders (NVR) in the equipment room located below the ▇▇▇▇▇▇▇ Command Post as shown on drawings. i. Provide for a minimum of 30-day continuous recording time of each camera at 7.5 frames per second (fps) during non-alarm conditions and 20fps during alarm, trouble, or tamper conditions. Live viewing shall be at 30fps for all cameras at each provided workstation.
Control and Monitoring. Each Party shall provide or arrange for 24-hour control and monitoring of their portion of the Interconnection Facilities. Formatted: Font: (Default) Times New Roman
Control and Monitoring. 1. Measurement equipment shall be installed and techniques used in order to monitor the parameters, conditions and mass concentrations relevant to the incineration or co-incineration process. 2. The measurement requirements shall be laid down in the permit or in the conditions attached to the permit issued by the competent authority.
Control and Monitoring. Manager shall provide unaudited quarterly statements and reports and annual audited statements, which comply with generally accepted accounting procedures (GAAP). Annual meetings are typically conducted to discuss important developments regarding investment and management issues.