PRODUCT DELIVERY, STORAGE AND HANDLING Clause Samples

POPULAR SAMPLE Copied 1 times
PRODUCT DELIVERY, STORAGE AND HANDLING. A. A. Storage; Concrete Materials: 1. Cement: Store in weather tight enclosures and protect against dampness, contamination and warehouse set.
PRODUCT DELIVERY, STORAGE AND HANDLING. A. Ensure that materials being used are placed in an area approved by the site representative and the Director of Buildings and Grounds. Deliver materials to the job site in the manufacturer's original, unopened containers or wrappings with the manufacturer's name, brand name and installation instructions intact and legible. B. Comply with the manufacturer's written instructions for proper material storage. 1. Store materials containing solvents in dry, well ventilated spaces with proper fire and safety precautions. Keep lids on tight. Use before expiration of their shelf life. C. Any materials which are found to be damaged shall be removed and replaced at the applicator's expense.
PRODUCT DELIVERY, STORAGE AND HANDLING. A. Deliver, store, and handle products using means and methods that will prevent damage, deterioration, and loss, including theft and vandalism. Comply with manufacturer's written instructions. B. Delivery and Handling: 1. Schedule delivery to minimize long-term storage at Project site and to prevent overcrowding of construction spaces. 2. Coordinate delivery with installation time to ensure minimum holding time for items that are flammable, hazardous, easily damaged, or sensitive to deterioration, theft, and other losses. 3. Deliver products to Project site in an undamaged condition in manufacturer's original sealed container or other packaging system, complete with labels and instructions for handling, storing, unpacking, protecting, and installing. 4. Inspect products on delivery to determine compliance with the Contract Documents and to determine that products are undamaged and properly protected.
PRODUCT DELIVERY, STORAGE AND HANDLING. A. Deliver, store, and handle products using means and methods that will prevent damage, deterioration, and loss, including theft and vandalism. Comply with manufacturer's written instructions.
PRODUCT DELIVERY, STORAGE AND HANDLING. A. Deliver equipment in manufacturer's containers, appropriately packaged and/or crated for protection during shipment and storage.
PRODUCT DELIVERY, STORAGE AND HANDLING. Deliver materials to job site in dry condition Store all materials on pallets held off the ground by means of planks or timber skids and protect with waterproof non-staining covers. .3 Maintain all materials in dry condition until use, except where specified otherwise. .4 Remove and replace contaminated materials at no cost to the Departmental Representative.
PRODUCT DELIVERY, STORAGE AND HANDLING. A. Deliver materials to the job site in the manufacturer's original, unopened containers or wrappings with the manufacturer's name, brand name and installation instructions intact and legible. Deliver in sufficient quantity to permit work to continue without interruption. B. Comply with the manufacturer's written instructions for proper material storage. 1. Store materials, except membrane, between 60 F and 80 F in dry areas protected from water and direct sunlight. If exposed to lower F temperature, restore to 60 minimum temperature before using. 2. Store materials containing solvents in dry, well ventilated spaces with proper fire and safety precautions. Keep lids on tight. Use before expiration of their shelf life. C. Insulation must be on pallets, off the ground and tightly covered with waterproof materials. D. Any materials which are found to be damaged shall be removed and replaced at the applicator's expense.
PRODUCT DELIVERY, STORAGE AND HANDLING. A. Deliver unit pavers to the site in steel banded, plastic banded, or plastic wrapped cubes capable of transfer by forklift or clamp lift. Unload pavers at job site in such a manner that no damage occurs to the product. B. Protect unit pavers and aggregate during storage and construction against soilage or contamination from earth and other materials. C. Sand shall be covered with waterproof covering to prevent exposure to rainfall or removal by wind. The covering shall be secured in place. D. Unused pavers shall be palletized and wrapped in plastic or other packaging materials that will prevent rust marks from steel strapping. E. During paver removal, remove pavers by hand and clean them of mortar, grout, or sand. Protect pavers at work site from theft, breakage, and damage. Store pavers on site in secure, locked area.
PRODUCT DELIVERY, STORAGE AND HANDLING. 8.1. Site has limited spaces for storage, only delivery of materials agreed upon by the Construction Manager will be allowed. Comply with Construction Manager’s allocations. 8.2. Schedule delivery of products & removal of material with Construction Manager. 8.3. Make available areas for storage of products and construction equipment to meet specified requirements, and to ensure a minimum of interference with progress of the Work and relocations. 8.4. Trade Contractor to provide flag persons, traffic signals, barricades and flares/lights/lanterns as required to perform the Work and to protect the public.
PRODUCT DELIVERY, STORAGE AND HANDLING a. Deliver and store all materials in their original containers in undamaged condition, sealed with labels intact, having manufacturers name, brand, weight, CSA, and other references to accepted standards clearly shown. b. Protect all materials from weather. In particular, insulation and roofing membranes must be kept absolutely dry and only as much removed from storage as can be applied and made watertight in the same day.