Requirements for Interconnection Clause Samples

The Requirements for Interconnection clause defines the technical and procedural standards that must be met for two or more systems, networks, or facilities to connect and operate together. Typically, this clause outlines the necessary equipment specifications, safety protocols, and compliance with regulatory standards that each party must adhere to before interconnection is permitted. For example, it may require the installation of specific protective devices or the completion of certain testing procedures. The core function of this clause is to ensure that all parties involved in the interconnection process maintain system reliability and safety, while minimizing operational risks and potential disruptions.
Requirements for Interconnection. In submitting this document, I the Owner, understand and agree to the following terms and conditions:
Requirements for Interconnection. ‌ Owner must not operate their Generating Facility in parallel with PG&E’s Distribution System until they receive written authorization for Parallel Operation from PG&E. Unauthorized Parallel Operation could result in injury to persons and/or damage to equipment and/or property for which the Owner may be liable.
Requirements for Interconnection. The licensee shall interconnect the Service and the Network with the external public telecommunication network and services operated by Hong Kong Telecom International Limited under its licence granted under the Ordinance and other fixed telecommunication networks and services licensed under the Ordinance and, where directed by the Authority, other telecommunication networks and services licensed, or deemed to be licensed, or exempt from licensing under the Ordinance.
Requirements for Interconnection. In submitting this document, I the Customer, understand and agree to the following terms and conditions: Permission to Interconnect Customers must not operate their Generating Facility in parallel with PG&E’s Distribution System until they receive written authorization for Parallel Operation from PG&E. Unauthorized Parallel Operation could result in injury to persons and/or damage to equipment and/or property for which the Customer may be liable. Safe Operation of your Generating Facility Notwithstanding any other provision of this Agreement, if at any time PG&E determines that either (a) the Customer’s Facility, or its operation, may endanger PG&E personnel, or (b) the continued operation of the Customer’s Facility may endanger the safe and reliable operation of PG&E’s electrical system, PG&E shall have the right to disconnect the Facility from PG&E’s system. Customer's Facility shall remain disconnected until such time as PG&E is satisfied that the unsafe condition(s) have been corrected. Interconnections on PG&E’s Secondary Network Applications to interconnect systems located in San Francisco or Oakland may require additional analysis to determine whether or not their proposed installation is on PG&E’s networked secondary system. Networked secondary systems are in place to provide heightened levels of reliability in densely populated areas and may affect the ability of PG&E to interconnect NEM customers. Please contact Generation Interconnection Services at ▇▇▇-▇▇▇-▇▇▇▇ or email ▇▇▇@▇▇▇.▇▇▇ if your proposed installation is in San Francisco where the zip code is 94102, 94103, 94104, 94105, 94107, 94108, 94109, 94111 or 94133 or in Oakland and where the zip code is 94607 or 94612. Meter Access Following your bi-directional meter installation, your meter must be installed in a safe PG&E-accessible location and remain unobstructed by locked gates or pets. Additionally, meter access must be maintained at all times for meter reading and system maintenance. Any animals owned by the customer, including pet dogs, should not have access to these areas to avoid hindering PG&E service personnel, preventing them from completing their work. If your self contained meter is being utilized as the AC disconnect switch, the meter must be accessible at all times and can not be located within a residence or garage. Document and Fee Requirements Other Documents and/or Fees may be required and there may be requirements for interconnection in addition to the above list, depend...
Requirements for Interconnection specifications will be defined in joint engineering planning sessions between the Parties. 2.7.1.5

Related to Requirements for Interconnection

  • Cost Responsibility for Interconnection Facilities and Distribution Upgrades 4.1 Interconnection Facilities 4.2 Distribution Upgrades

  • Initiating Interconnection 4.1 If ENT determines to offer Telephone Exchange Services and to interconnect with Verizon in any LATA in which Verizon also offers Telephone Exchange Services and in which the Parties are not already interconnected pursuant to this Agreement, ENT shall provide written notice to Verizon of the need to establish Interconnection in such LATA pursuant to this Agreement. 4.2 The notice provided in Section 4.1 of this Attachment shall include (a) the initial Routing Point(s); (b) the applicable technically feasible Point(s) of Interconnection on Verizon’s network to be established in the relevant LATA in accordance with this Agreement; (c) ENT’s intended Interconnection activation date; (d) a forecast of ENT’s trunking requirements conforming to Section 14.2 of this Attachment; and (e) such other information as Verizon shall reasonably request in order to facilitate Interconnection. 4.3 The interconnection activation date in the new LATA shall be mutually agreed to by the Parties after receipt by Verizon of all necessary information as indicated above. Within ten (10) Business Days of Verizon’s receipt of ENT’s notice provided for in Section 4.1of this Attachment, Verizon and ENT shall confirm the technically feasible Point of Interconnection on Verizon’s network in the new LATA and the mutually agreed upon Interconnection activation date for the new LATA.

  • Interconnection 2.1 This section applies to linking with suppliers providing public telecommunications transport networks or services in order to allow the users of one supplier to communicate with users of another supplier and to access services provided by another supplier, where specific commitments are undertaken.

  • Metering The Interconnection Customer shall be responsible for the Connecting Transmission Owner’s reasonable and necessary cost for the purchase, installation, operation, maintenance, testing, repair, and replacement of metering and data acquisition equipment specified in Attachments 2 and 3 of this Agreement. The Interconnection Customer’s metering (and data acquisition, as required) equipment shall conform to applicable industry rules and Operating Requirements.

  • Interconnection Customer’s Interconnection Facilities The Interconnection Customer shall design, procure, construct, install, own and/or control the Interconnection Customer’s Interconnection Facilities described in Appendix A at its sole expense.