The Grading Structure Sample Clauses

The Grading Structure. 22.1. The salary scale/grading structure for the Educational Class shall be as follows: 23.1. All external calls for application for the post of teacher, KGE and LSE in Church Schools will consider regular service in the Grade being applied for as part of the selection criteria assigning 24% of assessment marks of the interview for such purpose. Eligible candidates will have their years of regular service in the Grade being applied for valued at: (i) 2% per year for regular service in the Grade in a Church School; (ii) 1% per year for regular service in the Grade in any other licensed school; In both circumstances the maximum points that may be gained by an eligible candidate is 24%. 23.2. When shifting from one Church School to another, the notice period shall be one half of the applicable notice by law. However, if the employee requests it, and both present and new employer agree, the notice period can be reduced further or waivered.
The Grading Structure. 5.1. The grading structure has fifteen grades and one to six increments in each grade. The grades are simply numbered one to fifteen with one being the lowest and fifteen the highest. When the new SCPs were introduced by the National Joint Council, SCPs 10, 18 and 21 were included. SCP’s 13 and 16 were not included. The table below shows the 2018 and 2019 scales. GRADE 1 06 16,394 1 17,364 GRADE 1 07 16,495 1 17,364 GRADE 2 07 16,495 1 17,364 GRADE 2 8 16,626 2 17,711 GRADE 2 09 16,755 2 17,711 GRADE 3 09 16,755 2 17,711 GRADE 3 10 16,863 3 18,065 GRADE 3 11 17,007 3 18,065 GRADE 4 11 17,007 3 18,065 GRADE 4 12 17,173 4 18,426 GRADE 4 13 17,391 4 18,426 GRADE 4 14 17,681 5 18,795 GRADE 5 14 17,681 5 18,795 GRADE 5 15 17,972 5 18,795 GRADE 5 16 18,319 6 19,171 GRADE 5 17 18,672 6 19,171 GRADE 5 18 18,870 7 19,554 GRADE 6 18 18,870 7 19,554 GRADE 6 19 19,446 8 19,945 GRADE 6 20 19,819 9 20,344 GRADE 6 10 20,751 GRADE 6 21 20,541 11 21,166 GRADE 6 22 21,074 12 21,589 GRADE 7 22 21,074 12 21,589 GRADE 7 23 21,693 14 22,462 GRADE 7 24 22,401 15 22,911 GRADE 7 25 23,111 17 23,836 GRADE 7 18 24,313 GRADE 7 26 23,866 19 24,799 GRADE 8 26 23,866 19 24,799 GRADE 8 27 24,657 20 25,295 GRADE 8 21 25,801 GRADE 8 28 25,463 22 26,317 GRADE 8 29 26,470 23 26,999 GRADE 8 30 27,358 24 27,905 GRADE 9 30 27,358 24 27,905 GRADE 9 31 28,221 25 28,785 GRADE 9 32 29,055 26 29,636 GRADE 9 33 29,909 27 30,507 GRADE 9 34 30,756 28 31,371 GRADE 10 34 30,756 28 31,371 GRADE 10 35 31,401 29 32,029 GRADE 10 36 32,233 30 32,878 GRADE 10 37 33,136 31 33,799 GRADE 10 38 34,106 32 34,788 GRADE 11 38 34,106 32 34,788 GRADE 11 39 35,229 33 35,934 GRADE 11 40 36,153 34 36,876 GRADE 11 41 37,107 35 37,849 GRADE 11 42 38,052 36 38,813 GRADE 12 42 38,052 36 38,813 GRADE 12 43 39,002 37 39,782 GRADE 12 44 39,961 38 40,760 GRADE 12 45 40,858 39 41,675 GRADE 12 46 41,846 40 42,683 GRADE 13 46 41,846 40 42,683 GRADE 13 47 42,806 41 43,662 GRADE 13 48 43,757 42 44,632 GRADE 13 49 44,697 43 45,591 GRADE 13 50 45,660 44 46,573 GRADE 14 50 45,660 44 46,573 GRADE 14 51 46,615 45 47,547 GRADE 14 52 47,585 46 48,537 GRADE 14 53 48,548 47 49,519 GRADE 14 54 49,575 48 50,567 GRADE 14 55 50,610 49 51,622 GRADE 15 55 50,610 49 51,622 GRADE 15 56 51,641 50 52,674 GRADE 15 57 52,661 51 53,714 GRADE 15 58 53,691 52 54,765 GRADE 15 59 54,718 53 55,812 GRADE 15 60 55,747 54 56,862 The first point of each scale is the entry or foundation point, (shown in dark grey) which is expected to be the first learning year. A f...

Related to The Grading Structure

  • PRICING STRUCTURES Licenses and Support Services for the Licensed Programs to which this OST applies are granted according to the pricing structures mentioned in the related Transaction Document. Standard pricing structures are defined in the section “DEFINITIONS” of this OST, even though those pricing structures may not be applicable to the DS Offerings to which this OST applies. Other pricing structures may be made available on a case by case basis.

  • Classification Structure All employees working under this Agreement shall be classified according to the skill based classification structure set out in Appendix A.

  • Power System Stabilizers The Developer shall procure, install, maintain and operate Power System Stabilizers in accordance with the requirements identified in the Interconnection Studies conducted for Developer’s Large Generating Facility. NYISO and Connecting Transmission Owner reserve the right to reasonably establish minimum acceptable settings for any installed Power System Stabilizers, subject to the design and operating limitations of the Large Generating Facility. If the Large Generating Facility’s Power System Stabilizers are removed from service or not capable of automatic operation, the Developer shall immediately notify the Connecting Transmission Owner and NYISO. The requirements of this paragraph shall not apply to wind generators.

  • Master Feeder Structure If permitted by the 1940 Act, the Board of Trustees, by vote of a majority of the Trustees, and without a Shareholder vote, may cause the Trust or any one or more Series to convert to a master feeder structure (a structure in which a feeder fund invests all of its assets in a master fund, rather than making investments in securities directly) and thereby cause existing Series of the Trust to either become feeders in a master fund, or to become master funds in which other funds are feeders.

  • Quality control system (i) The Contractor shall establish a quality control mechanism to ensure compliance with the provisions of this Agreement (the “Quality Assurance Plan” or “QAP”). (ii) The Contractor shall, within 30 (thirty) days of the Appointed Date, submit to the Authority’s Engineer its Quality Assurance Plan which shall include the following: (a) organisation, duties and responsibilities, procedures, inspections and documentation; (b) quality control mechanism including sampling and testing of Materials, test frequencies, standards, acceptance criteria, testing facilities, reporting, recording and interpretation of test results, approvals, check list for site activities, and proforma for testing and calibration in accordance with the Specifications for Road and Bridge Works issued by MORTH, relevant IRC specifications and Good Industry Practice; and (c) internal quality audit system. The Authority’s Engineer shall convey its approval to the Contractor within a period of 21 (twenty-one) days of receipt of the QAP stating the modifications, if any, required, and the Contractor shall incorporate those in the QAP to the extent required for conforming with the provisions of this Clause 11.2. (iii) The Contractor shall procure all documents, apparatus and instruments, fuel, consumables, water, electricity, labour, Materials, samples, and qualified personnel as are necessary for examining and testing the Project Assets and workmanship in accordance with the Quality Assurance Plan. (iv) The cost of testing of Construction, Materials and workmanship under this Article 11 shall be borne by the Contractor.