Back-up Generator Sample Clauses

POPULAR SAMPLE Copied 78 times
Back-up Generator. A. Tenant shall be permitted, at its sole cost and expense, to install, connect to the Building, operate and maintain a diesel back-up electrical generator and all related equipment switching gear, conduit and equipment mounts (collectively, “Generator”) screened from public view to be located in a location in the Complex mutually agreed upon by Landlord and Tenant. The installation of the Generator shall be subject to all conditions and requirements as provided for in Section 10 hereof. Landlord reserves the right to relocate the Generator from time to time at Landlord’s cost and expense, and to install its own generator providing back-up power to the Common Areas and emergency lighting in the Complex in the same area as Tenant’s Generator. B. The installation, maintenance, repair, replacement, removal and repair of any damage relating to the Generator, and all related costs, shall be the sole responsibility of Tenant, subject to Landlord’s reasonable direction and control. Landlord shall supply diesel fuel for the Generator from the central tank at the Building which the Landlord shall maintain at its sole cost and expense, but with the diesel fuel drawn from same by Tenant to be at Tenant’s sole cost and expense based on a meter (also to be installed and maintained at Tenant’s sole cost and expense). Notwithstanding anything to the contrary contained herein, in no event shall Tenant be permitted to install or maintain on or about the Leased Premises or the Building any underground fuel storage tanks or any diesel fuel tanks of its own. C. Upon the expiration or termination of this Lease Agreement, or at such time as Tenant decides that it no longer wishes to maintain the Generator, Tenant shall be obligated to remove the Generator and all related or ancillary equipment, wiring, and the like, and Tenant shall repair any damage caused by the installation and use of the Generator and by such removal in a manner and method reasonably satisfactory to Landlord. D. The Generator shall be used solely for the generation of emergency power in the event of and only for the duration of a power outage or “brownout”, or interruption of electrical service to the Building. Tenant shall be permitted to periodically test the Generator to confirm that it is in good working order. The Generator shall be used solely for purposes of Tenant’s business in the Leased Premises. The use and operation of the Generator shall comply with all applicable provisions of this Lease Agree...
Back-up Generator. Tenant shall be permitted to connect its equipment located in the Premises to the back-up generator equipment serving the Building (the “Back-up Generator”), at no additional cost to Tenant, by plugging such equipment into the red electrical outlets currently located in the Premises (the “Back-up Generator Outlets”). Tenant’s use of such Back-Up Generator Outlets shall be at the sole risk and hazard of Tenant and Landlord does not warrant or make any representation, express or implied, concerning the condition, adequacy or sufficiency for Tenant’s present or future purposes of the Back-up Generator Outlets and/or Back-up Generator.
Back-up Generator. Subject to compliance with Legal Requirements, Tenant shall have the right to install a back-up generator (or other emergency back-up equipment) for the exclusive use of Tenant (“Tenant’s Generator”) on the Property in such location as may be approved by Landlord in its sole and absolute discretion, in accordance with the provisions of this Section 29.15. Tenant shall furnish to Landlord detailed plans and specifications for Tenant’s Generator, the associated fuel tank (which shall be located above-ground) or other fuel supply source required for the operation of Tenant’s Generator (“Tenant’s Tank”) and all wires, lines, pipes, conduits and other apparatus in connection with Tenant’s Generator for Landlord’s prior approval, which approval shall not be unreasonably withheld, conditioned, or delayed. Upon approval of such plans and specifications for Tenant’s Generator, Tenant, using Landlord’s contractor (whose fees shall be competitive), shall have the right to install Tenant’s Generator and Tenant’s Tank, at Tenant’s expense. Tenant shall comply with all Legal Requirements in connection with the installation, use and maintenance of Tenant’s Generator, Tenant’s Tank and all lines, wiring, pipes, conduits, other apparatus in connection therewith and Tenant shall keep the Premises, Building and Land free and clear from liens arising from or related to the installation, use, maintenance and repair thereof. Tenant shall be responsible for procuring whatever approvals, licenses or permits may be required for the installation, use and maintenance of Tenant’s Generator, Tenant’s Tank and all lines, wiring, pipes, conduits, other apparatus in connection therewith and the related support systems required for the installation and use of Tenant’s Generator and Tenant’s Tank and the related support systems or operation of any equipment served thereby. Landlord agrees that, at no cost to Landlord, it shall cooperate with Tenant in Tenant’s pursuit of any such approvals, licenses, or permits, which cooperation shall include executing any necessary owner’s consent forms. Upon termination or expiration of this Lease, Tenant shall, at Landlord’s sole option, remove Tenant’s Generator, Tenant’s Tank and all lines, wiring, pipes, conduits, other apparatus in connection therewith, in which event Tenant shall repair and restore the Property and Building to the condition that existing prior to such installation, reasonable wear and tear and events of casualty and condemnation e...
Back-up Generator. A. Tenant shall be permitted, at its sole cost and expense, to install, connect to the Building, operate and maintain a natural gas back-up electrical generator and all related equipment switching gear, conduit and equipment mounts (collectively, “Generator”) screened from public view to be located in a location in the Complex mutually agreed upon by Landlord and Tenant. The installation of the Generator shall be subject to all conditions and requirements as provided for in Section 10 hereof. Landlord reserves the right to relocate the Generator from time to time at Landlord's cost and expense, and to install its own generator providing back-up power to the Common Areas and emergency lighting in the Complex in the same area as Tenant’s Generator. B. The installation, maintenance, repair, replacement, removal and repair of any damage relating to the Generator, and all related costs, shall be the sole responsibility of Tenant, subject to Landlord's reasonable direction and control. Landlord shall supply diesel fuel for the Generator from the central tank at the Building which the Landlord shall maintain at its sole cost and expense, but with the diesel fuel drawn from same by Tenant to be at Tenant’s sole cost and expense based on a meter (also to be installed and maintained at Tenant’s sole cost and expense). Notwithstanding anything to the contrary contained herein, in no event shall Tenant be permitted to install or maintain on or about the Leased Premises or the Building any underground fuel storage tanks or any diesel fuel tanks of its own. C. Upon the expiration or termination of this Lease Agreement, or at such time as Tenant decides that it no longer wishes to maintain the Generator, Tenant shall be obligated to remove the Generator and all related or ancillary equipment, wiring, and the like, and Tenant shall repair any damage caused by the installation and use of the Generator and by such removal in a manner and method reasonably satisfactory to Landlord. D. The Generator shall be used solely for the generation of emergency power in the event of and only for the duration of a power outage or “brownout”, or interruption of electrical service to the Building. Tenant shall be permitted to periodically test the Generator to confirm that it is in good working order. The Generator shall be used solely for purposes of Tenant's business in the Leased Premises. The use and operation of the Generator shall comply with all applicable provisions of this Lease ...
Back-up Generator. One (1) 1300 KW shared Building generators are maintained by Landlord’s engineering staff. Back-up Power is included in all AC amperage usage.
Back-up Generator. Subject to Landlord's written approval as to the number and location thereof, Tenant may install backup generators on the Property. Tenant shall be responsible for all costs associated with the installation of such generators. Tenant shall construct an enclosure for the generators and maintain such enclosure in compliance with all laws, rules, regulations and requirements of local governing authorities. To the extent required by law, Tenant shall obtain and continuously maintain in full force and effect all required permits, licenses, and authorizations required for it to install, maintain and repair the generator at the Property. Tenant shall not install, maintain, repair or operate any generator or enclosure that (a) adversely affect, impair, restrict or impact the structural integrity or use of, or the mechanical, plumbing, structural or electrical systems of the Property, or (b) interfere with the operation of the Property. Tenant shall remove the generator at the termination or expiration of this Lease, and if the installation of the generator damages or replaces existing landscaping and/or parking spaces, Tenant, at Tenant's sole cost and expense, shall replace such landscaping and/or parking spaces upon removal of the generator. Any parking spaces occupied by the generator shall come out of the Tenant's parking allocation.
Back-up Generator. During the Lease Term, Tenant shall have the right, free of charge, to use designated areas adjacent to or near the Building in a location mutually acceptable to Landlord and Tenant (collectively, the “Generator Pad License Area”), for the installation and use by Tenant during the Lease Term of a back-up generator (the “Generator”); provided, however, that (i) Tenant shall obtain all required approvals from the ARC (if any) with respect to the Generator, (ii) Tenant shall obtain Landlord’s prior written approval, which approval shall not be unreasonably withheld, conditioned or delayed, of the proposed size, location and aesthetic impact of the Generator, (iii) Tenant will at its sole cost comply with (1) all Applicable Laws, and (2) Landlord’s reasonable requirements from time to time, in any way relating to the Generator, and (iv) in the event the Generator Pad License Area is located in the Surface Lots (as defined in Exhibit D attached hereto) and any Parking Spaces are lost as a result of the installation of the Generator, such lost Parking Spaces shall be deducted from the number of Parking Spaces available to Tenant pursuant to Exhibit D. If, and only if, Landlord has notified Tenant, in writing, at the time Landlord initially approves the Generator that Landlord will require removal upon the expiration or earlier termination of this Lease, then Tenant shall, at Tenant’s sole cost and expense, remove the Generator upon the expiration or earlier termination of this Lease (which removal shall include restoration of the Generator Pad License Area to the condition it was in prior to the installation of the same); provided, however, even if Landlord does not require removal, Tenant shall have the right, at its sole cost and expense, to remove the Generator upon the expiration or earlier termination of this Lease (which removal shall include restoration of the Generator Pad License Area to the condition it was in prior to the installation of the same). In the event Landlord does require removal of the Generator and Tenant fails to remove the same upon expiration or earlier termination of this Lease, Landlord may remove and dispose of the same and all costs incurred by Landlord in connection with such removal shall be payable by Tenant to Landlord on demand as Additional Rent. In the event Landlord does not require removal of the Generator and Tenant fails to remove the same upon expiration or earlier termination of this Lease, the Generator shall become t...
Back-up Generator. (a) Emergency Generator Power. Upon the Commencement Date, Landlord agrees that in the event of an interruption of power to the Building, Tenant may connect Tenant loads to the emergency generator serving the Building (the “Emergency Generator”) on the following conditions: (i) Tenant loads to the Emergency Generator shall in no event exceed Tenant’s Share of the total kVA capacity of the Emergency Generator available for use in tenant premises; (ii) Any use of the Emergency Generator, including the duration of use, shall be subject to the requirements and limitations (if any) imposed by applicable Law; and (iii) In the event of an emergency causing an interruption of power to any portion of the Building, Landlord may, in its reasonable discretion, immediately shed or shut down Tenant loads (an “Emergency Shut Down”) to the extent necessary to redirect the power from the Emergency Generator (“Emergency Generator Power”) to the Building’s emergency/life-safety systems (e.g., elevators, fire-life safety and emergency lighting). Once known, Landlord shall promptly give notice to Tenant of the percentage capacity of the Emergency Generator Power necessary to provide power to the Building’s emergency/life-safety systems. To the extent Landlord’s load shedding equipment accommodates shedding Tenant loads in stages, then Landlord shall use commercially reasonable good-faith efforts to shed Tenant loads in a priority which Tenant has delivered to Landlord in writing.
Back-up Generator. Critical load generators are installed in an N+1 configuration and maintained by Landlord’s engineering staff. Back-up Power is included in all AC amperage usage.
Back-up Generator. Tenant shall have the right to install and use a back-up generator not to exceed 250 kw (the “Back-up Generator”) exclusively serving the Premises on the following terms and conditions: (a) It is understood and agreed that Tenant shall be responsible, at its sole cost and expense, for installing all necessary connections (the “Generator Connections”) between the Back-up Generator and the Premises. In addition to complying with the applicable construction provisions of this Lease, Tenant shall not install or operate the Back-up Generator or Generator Connections in any portion of the Building or the Site until (x) Tenant shall have obtained Landlord’s prior written approval, which approval will not be unreasonably withheld, delayed or conditioned, of Tenant’s plans and specifications for the placement and installation of the Back-up Generator and the Generator Connections, and (y) Tenant shall have obtained and delivered to Landlord copies of all required governmental and quasi-governmental permits, approvals, licenses and authorizations necessary for the lawful installation, operation and maintenance of the Back-up Generator and Generator Connections.