SCOPE OF FACILITIES Sample Clauses
The 'Scope of Facilities' clause defines the range and types of financial accommodations or services that a lender agrees to provide to a borrower under an agreement. It typically outlines the specific credit lines, loans, or other financial products included, as well as any limits or conditions attached to their use. By clearly delineating what is and is not covered, this clause ensures both parties have a mutual understanding of the available facilities, thereby preventing disputes and setting clear expectations for the relationship.
SCOPE OF FACILITIES. Train 3 is a identical copy of Train 1 and Train 2 LNG liquefaction and pre-treatment facilities, and ties into to a common NG supply, LNG and condensate run-down lines, and is connected to extended utilities distribution and process control. The scope includes amongst others: · Natural gas pretreatment units, including: · Acid gas removal unit (including H2S scavenging & Hg removal), ([***]), · Dehydration unit ([***]) The specification of treated gas exiting the Dehydration Unit shall be pursuant to the BOD and the Process Design Basis, · HRU, ([***]) · Natural gas liquefaction unit, including: · Refrigeration, ([***]), · Compressor string A, ([***]), · Compressor string B, ([***]), · Liquefaction, (Unit number 14) · Additional detail: · Train 3 North Substation · Train 3 LER · Train 3 South Substation · Train 3 ASDS Substation 1 · Train 3 ASDS Substation 2 · Train 3 Re-compressor ASDS Substation · Common Systems and infrastructure Equipment required for the operation of Train 3 but not required for the operation of Train 1 or Train 2, as indicated in Major Equipment List, [***], such as: · AGRU oxidizer to similar design as in Train 1 except that treatment of condensate storage vapor returns is not required; · Extended electrical power distribution, ICSS, and Telecoms network, inclusive CCB added Equipment; · Roads and paving to serve the Train 3 area. · Train 3 LNG rundown to tie-in location in LNG storage tank area · LNG Train 3 Underground Works · Temporary Facilities required for construction and initial operation of the facilities. · Tie-ins for expansion to Train 4 rundown, to facilitate future expansion without disrupting operations. · Tie-in of Train 3 roads to Site roads, · Train 3 Surface water drainage systems segregated by source, or potential contamination; · Effluent water treatment, [***] (primary treatment only – including Holding Ponds and Outfalls, and First Flush Basins for Train 3; · Common Systems and infrastructure required for the operation of Train 3, including: · Boil-off gas compression facilities for Train 3 with compressor installed and ready for operation at RFSU Train 3, · Tie-ins to Amine storage and Hot Oil Storage · Tie-ins to Refrigerant storage; · Utility Systems, including the following: · Essential Power Generation Systems including the following: · Essential power generator, ([***]) (one additional unit for Train 3) · Essential Power Distribution to Train 3 users · Water Storage and Water Supply Systems, comprising ...
SCOPE OF FACILITIES. 19 7.0 CONTRACTOR SCOPE OF WORK .................................................................................................................. 21 7.1 Home Office Services ................................................................................................................................. 21 7.2 Supply of Equipment and Materials Required to Construct the Facility .............................................. 21 7.3 Traffic and Logistics Services ................................................................................................................... 22 7.4
SCOPE OF FACILITIES. The Scope of Facilities included in Feasibility Study verification will consist of the following: • Site preparation layouts • Site grading plan • In-plant roads • Physical upgrade plant (PUG) • Crushing and materials handling of ROM ore • Grinding PUG concentrates • Metal recovery plant • Leaching and CCD • Solution purification • Two-stage Solvent extraction • Pyrohydrolysis and product packaging for cobalt and nickel • Manganese carbonate precipitation and packaging • Tailings disposal (tails neutralization tanks and tailings mixing tank only) • Sulfur burning unit to produce 17% SO2 burner gas with re-formation to nearly 100% SO2 • Combined Heat and Power unit to produce a balanced supply of electrical and thermal energy for the project with adequate backup diesel powered electric generators. • Reagent receiving, handling, storage and feed systems • All permanent site services including general site preparation, water, power, sewage, and roads within the battery limits of the process plant • Ancillary buildings including maintenance shop, warehouse, general office, laboratory, mine office, change room, and cafeteria • Potable and process water distribution and fire fighting systems including pumps, collection piping, field storage tank, and supply pipelines to the Project battery limits • Process control • Water distribution within plant • Fire control system • Septic waste disposal Rev 5 Geovic Cameroon PLC Nkamouna Cobalt-Nickel-Manganese Project • PUG water pond and recycle water pumps and piping • Crude pregnant liquor solution storage/surge pond • PUG middlings concentrate decant pumps and piping The battery limits for the Scope of Facilities to be optimized by the Alliance Team include all items downstream of the ROM ore feed ▇▇▇▇▇▇ and upstream of the tailing mix tank discharge flange. GeoCam and other contractors will be responsible for the Project Scope of Facilities upstream from the ROM ore feed ▇▇▇▇▇▇. Knight Piesold will be responsible for all tailings related Scope of Facilities from the downstream tailing mix tank discharge flange.
SCOPE OF FACILITIES. 8.1 Unless otherwise expressly limited in the Employer’s Requirements, the Contractor’s obligations cover the provision of all Plant and the performance of all Installation Services required for the design, and the manufacture (including procurement, quality assurance, construction, installation, associated civil works, Pre-commissioning and delivery) of the Plant, and the installation, completion and commissioning of the Facilities in accordance with the plans, procedures, specifications, drawings, codes and any other documents as specified in the Section, Employer’s Requirements. Such specifications include, but are not limited to, the provision of supervision and engineering services; the supply of labor, materials, equipment, spare parts (as specified in GC Sub-Clause 8.3 below) and accessories; Contractor’s Equipment; construction utilities and supplies; temporary materials, structures and facilities; transportation (including, without limitation, unloading and hauling to, from and at the Site); and storage, except for those supplies, works and services that will be provided or performed by the Employer, as set forth in the Appendix to the Contract Agreement titled Scope of Works and Supply by the Employer.
SCOPE OF FACILITIES. The Parties will coordinate in good faith to determine a final engineering and procurement plan (including but not limited to, estimation of final costs, construction milestones, scope, etc.) for the Blackberry Substation Upgrade with an expected in-service date by 1/1/2026.
SCOPE OF FACILITIES. The Scope of Work is amended to include pile driving for the SPL, LLC. Cathodic Protection Rectifier Platform and Drum Storage Shelter facilities. The additional piling will be conducted using BOMAC shorter length piles. As a result, the performance of these piles will not be covered by ▇▇▇▇▇▇▇’▇ warranty governed by Article 12.B.1. of the Agreement.
SCOPE OF FACILITIES. The following describes the Facility to be designed, constructed, tested and commissioned by Contractor. Work performed prior to the restart has been designed to the codes and standards in effect at the time of the original contract execution. The impact of changes to codes and standards between the deferral and restart may result in a Change Order in accordance with the terms of the Agreement.
SCOPE OF FACILITIES. The scope of Contractor supplied facilities shall include the facilities for Train 1, Train 2 and Common Systems as listed below, as further defined in this SOW hereafter, and as described in the BOD.
SCOPE OF FACILITIES. WORK/SERVICES: MG Studios agrees to provide the all-inclusive Pre-Production, Production and Post Production facilities, work and services as set forth in "Exhibit A." MG Studios may render the same or similar services for others as well as to engage in other business activities in the entertainment industry.