Track Maintenance Clause Samples

The Track Maintenance clause outlines the responsibilities and standards for maintaining railway tracks or similar infrastructure. It typically specifies the frequency and type of inspections, repairs, and upkeep required to ensure the tracks remain safe and operational, and may assign these duties to a particular party, such as a contractor or property owner. By clearly defining maintenance obligations, this clause helps prevent accidents, ensures regulatory compliance, and allocates responsibility for ongoing track safety and performance.
Track Maintenance. The Department shall, during the term of this Agreement, cause CSXT or other contractors to maintain the Virginia Tracks in a condition that will accommodate the operation of the Service, and no less than that required to prevent any downgrade to the Virginia Tracks below Class 4 pursuant to 49 C.F.R. § 213.9 (or any successor regulation). However, the Department shall have no duty to maintain the CSXT Tracks, and the Department does not guarantee the condition of the Virginia Tracks or that the Service will not be delayed or interrupted. If the Commissions contend the Department has failed to cause CSXT or other contractors to maintain the Virginia Tracks as anticipated by this Article Six, the Commissions may submit written notice of such contention to the Department, and within 30 days of such written notice the parties shall meet and confer to address and resolve such failure. If such meeting and conference does not finally resolve the issues noticed in the written notice submitted by the Commissions, either party may submit the matter pursuant to the dispute resolution provisions of this Agreement. However, in no event shall such failure, including but not limited to any FRA findings or reports, impose any liability on any of the Virginia Indemnitees except as provided by Article Nine hereof with respect to gross negligence, nor shall any such failure absolve the Commissions of any of the obligations imposed upon them by Article Nine hereof.
Track Maintenance. 5.1. Overall inspection and maintenance responsibility of the Track will remain with the Council at all times and for a minimum of 7 years. However, the Club is to be responsible and take an active role in routine maintenance of the track, including: 5.1.1. The track surface start hill should be kept free and clean from organic materials especially in and around the start-gate system (if present). Typically a sweeping brush and/or an air blower can be used to sweep the start hill clean and blow away any debris from the track surface. Ideally this should be done 1-2 times per week 5.1.2. The Club is responsible for inspecting the whole of the track for any safety defects prior to each and every session including removing and disposing any debris, glass, litter, leaves and grass from the track surface. The Club shall not proceed with the session if the track is not deemed to be in a safe condition. 5.1.3. The Club is responsible for the cleanliness of the site during its clubs sessions to ensure that it is free from accumulations of litter, debris and alike, the Club will remove and dispose of these items. Litter removal is the responsibility of the Council. 5.1.4. The Club Volunteers to report any major faults with the facility or cases of vandalism in the park to the Council.
Track Maintenance. 6.1 NPE and Jonesboro shall each maintain the Tracks consistent with Federal Railroad Administration Class 1 Standards, 49 Code of Federal Regulations 213-Track Safety Standards and 49 Code of Federal Regulations 214-Railroad Workplace Safety, and any such replacement standards that may be enacted, in accordance with their respective proportionate use of the Tracks. 6.2 The Parties further agree to pay their respective proportionate share of the above- referenced Track maintenance costs, with the cost share formula to be determined by the annual percentage of carloads moved on the Tracks attributable to each Party. By way of example only, if NPE moves 70% of the carloads in a given year and BNSF or other railroad or switching entity moves the remaining 30% of the carloads, NPE shall pay 70% of the annual maintenance costs, and Jonesboro shall pay the remaining 30% of the annual maintenance costs in accordance with Jonesboro’s obligation under the Industry Track Agreement to maintain the Tracks on BNSF’s behalf. 6.3 For purposes of this section, such repairs include, but are not limited to, tie replacements, joint bar replacements, replacements of bolts, spikes, broken tie plates and fittings, and repair or replacement of cracked or broken rails, frogs and/or switch parts. In addition, the Parties shall keep the Railroad Facilities in a clean condition and keep all weeds mowed and trash and debris picked up and removed. 6.4 NPE shall have no maintenance obligation or other liability with respect to the acts or omissions of BNSF, including its corporate parents and affiliates, and their respective officers, directors, employees, agents, representatives, and respective successors and assigns.
Track Maintenance. 4.1 During the Term of this Agreement, NGA shall remain solely responsible, at its sole cost and expense, for the Routine Maintenance of the NGA Track and all other rail-related infrastructure within NFMIP, including but not limited to at-grade road crossings and warning devices for same. “Routine Maintenance” shall mean those items that are maintained on a week- to-week basis as required in order to minimize or eliminate disruption of service. Routine Maintenance shall include, but not be limited to, maintenance of rail joints (including replacing loose or missing bolts, identifying thermal stresses, and correcting joint tie defects); identification and corrective suggestions for gauge and alignment problems, surface and elevation deviations, and visible rail defects; vegetation control; snow and ice removal; maintenance of turnouts, at- grade crossings and warning devices for same (including but not limited to active warning devices); replacement of a small number of ties (defined as fewer than 200 ties annually on the NGA Track); repair and inspection of all bridges, culverts, signals and switches; and replacement of rail in small sections (defined as less than 200 feet of rail on the NGA Track annually).
Track Maintenance. Work Day and Meal Break Vacancies in Track Gangs Promotion Method of Payment Meals Travel Allowances Clothing Section Tool-House Job Classifications Welders-in-training Work Day and Work Week Method of Payment Travel Allowance Meals Staff Vacancies Job Classifications Parking Facilities Absence Leave of Sick Leave Accidents Reports Adoption Leave Agreement Coverage, Duration, Reopen Annual Vacation Arbitration Benefit Plans Weekly Indemnity Long Term Disability Bereavement Leave Bumping Bulletins Certification Contracting Out Court Appearance Witness Defendant Discipline, Dismissal Employment New Employee Family ResponsibilityLeave Grievances Interpretation of Agreement Interview, Call-in Jury Duty Layoff and Recall Leave of Absence Union Business Annual Vacation Maternity Leave Medical, Reporting For Medical Examination Overtime Banking Parental Leave SUBJECT INDEX PART G -GENERAL Section Page Pension Plan Personnel Records Probationary Period Promotion Recall Reporting Time Accidents, Court, Medical, Other Reports Layoff Safety Sick Leave Shift Differential Shorter Work Week Statutory Holidays Spray Painting Suspension Technological Change Termination Annual Vacation Probationary Employees Time Limits Grievance Procedure Time Slips Tool Allowance Union Recognition, Security, Dues Checkoff, Leave for Business Vacancies Vacation Veteran’s Leave Working Practices Wage Schedule Wage Schedule Section Page Absence Reporting After Assignment of Work SAP Call Change of Call Chief Relief Clothing Allowance Conductor Dead Heading Dismissal Seniority Hours of Work Change Minimum Pay Overtime Assignments Payment of Wages Shortages in Pay Pilots Promotion ProtectedTrainmen Railway Equipment Resignation Rest Seniority Sign-up Spareboard List Rules Guarantee Termination Three-man Crew Two-man Crew Training Travel Allowance Tying Up Section Page Assignment of Work SAP ▇▇▇▇▇▇ Charge Hand Clothing Allowance First Aid Freight Car Inspector Helper Hours of Work Job Classifications Lead Hand Locomotive Mechanic 'A Locomotive Mechanic Machinist Meals Overtime Assignment Payment Payment of Wages Promotion Railway Serviceman Relief for Another Job Holidays Standby on Tool Allowance Travel Allowance Welder in Training Bridgetender Clothing Allowance Hours of Work Meals Minimum Pay Night Work Payment of Wages Promotion Relief ▇▇▇▇▇▇▇ Signal Maintainer Tool House Travel Allowance Welder-in -Training Vacancies Section Page Car Control Freight Clerk Hours of Non-Standard Hours Parki...
Track Maintenance. The County will be responsible for maintaining streetcar track, including special track work, in accordance with the County’s applicable maintenance procedures.

Related to Track Maintenance

  • Routine Maintenance (i) CRC shall be responsible for Routine Maintenance when necessary or desirable to maintain the Shared Assets in a safe operating condition, and to permit and facilitate (A) the performance by CRC of its obligations pursuant to this Agreement, and (B) the use of Shared Assets by the Operators in accordance with this Agreement. (ii) CSXT or NSR, directly or through their respective affiliates, may perform the work which CRC performed prior to the date of this Agreement when (A) CRC does not possess the skills needed for such work, (B) CRC lacks the necessary employees to do such work in a timely fashion, or (C) CRC does not possess the equipment needed to do such work. CRC and the party performing the work shall agree to a reasonable fee for such work prior to performance. CRC, CSXT and NSR may agree to have additional work performed either by CSXT, NSR or their affiliates.

  • System Maintenance The Trust understands that USBFS will perform periodic maintenance to the System(s), which may cause temporary service interruptions. To the extent possible, USBFS shall notify the Trust of all planned outages and will perform any necessary maintenance during non-business hours.

  • Hardware Maintenance Hardware Purchased from NCR Voyix or a Reseller is eligible for coverage under NCR Voyix’s Hardware Maintenance Policy for an additional monthly fee, provided however, that some restrictions apply. Subscribed Hardware includes Hardware Maintenance at no additional charge, subject to timely payment of all fees. Provided that you are current on your payment obligations and otherwise in compliance with this Agreement, your Hardware Maintenance includes remote maintenance services and support via telephone, email or live text or chat on the terms stated at the Account Portal (you acknowledge that third-party message and data rates may apply). NCR Voyix’s now-current Hardware Maintenance Policy can be found at ▇▇▇▇▇://▇▇▇.▇▇▇▇▇▇▇▇.▇▇▇/dam/restaurant/docs/ncr-us- merchant-hw-maintenance-policy-ac.pdf.

  • Road Maintenance Purchaser shall maintain roads, commensurate with Purchaser’s use, in accor- dance with Road Maintenance Requirements in C5.31 and the Road Maintenance Specifications. Performance of road maintenance work by Purchaser may be required prior to, during, or after each period of use. The timing of work accomplishment shall be based on Purchaser’s Op- erating Schedule under B6.31.

  • Planned Maintenance (a) Subject to any modification or amendment of this Agreement made pursuant to Section 4.2(c) or Section 7.3(d), Planned Maintenance occurring during the Delivery Term shall be coordinated and scheduled in accordance with this Section 9.6. Seller shall perform all Planned Maintenance (including Major Planned Maintenance) in a manner that optimizes the generation and benefits to Buyer of the Contract Energy, Storage Energy, and other Products (e.g., during off-peak periods and low-irradiance periods) and, without limiting the foregoing, either (i) outside of Daylight Hours or (ii) during the months of October and November only, during Daylight Hours; provided, however, that the foregoing restrictions shall not apply to any Planned Maintenance that Seller is required to perform pursuant to any applicable manufacturer warranty that cannot reasonably be performed by Seller subject to such restrictions. (b) Seller shall deliver to Buyer a proposed schedule for Planned Maintenance in respect of each Contract Year (“Planned Maintenance Schedule”) no later than ninety (90) Days before the start of such Contract Year. Planned Maintenance Schedules submitted by Seller shall (i) comply with the second sentence of Section 9.6(a) and (ii) include reasonably detailed descriptions of the Planned Maintenance to be performed, the Days and times in which each type of Planned Maintenance is scheduled to be performed, the estimated amount(s) of Contract Capacity and Storage Capacity that will be unavailable due to Planned Maintenance and the total number of hours that Seller expects that the Contract Capacity and Storage Capacity will be unavailable due to Planned Maintenance. The general form for the Planned Maintenance Schedule is set forth in Schedule 9.6. (The Planned Maintenance descriptions reflected in the general form set forth in Schedule 9.6 are provided for indicative purposes only, and are not necessarily representative of the detail, time periods, or certainty required for a Planned Maintenance Schedule hereunder.) (c) Buyer shall have the right to disapprove, in its reasonable discretion (provided that Buyer shall have the right to disapprove, in its sole and absolute discretion, any Planned Maintenance proposed by Seller that is inconsistent with the terms of this Agreement), any Planned Maintenance set out in any Planned Maintenance Schedule proposed by Seller for any Contract Year, except for any Planned Maintenance that (i) is scheduled to occur outside of Daylight Hours or during Daylight Hours during the months of October and November or (ii) Seller is required to perform pursuant to any applicable manufacturer warranty and that is scheduled to occur in compliance with Section 9.6(a). If Seller submits its Planned Maintenance Schedule for a Contract Year in accordance with the requirements of this Agreement and Buyer does not disapprove of any Planned Maintenance set out in such Planned Maintenance Schedule by sixty (60) days after submission, then such Planned Maintenance Schedule shall be deemed approved. If Buyer, in the exercise of its discretion as set forth above, disapproves any Planned Maintenance in such Planned Maintenance Schedule within the applicable time period specified above after its submission, Buyer shall notify Seller and the Parties shall use Commercially Reasonable Efforts to agree upon and finalize a mutually acceptable Planned Maintenance Schedule for the applicable Contract Year. Seller shall conduct Planned Maintenance during such Contract Year only in accordance with an agreed Planned Maintenance Schedule; provided, however, that Seller may (A) move Planned Maintenance included in an agreed Planned Maintenance Schedule that is not Major Planned Maintenance, so long as such move is consistent with the terms of this Agreement (including the second sentence of Section 9.6(a)) or, with respect to Major Planned Maintenance, if such Major Planned Maintenance is scheduled to occur outside of Daylight Hours or during Daylight Hours during the months of October and November and (B) schedule and perform Planned Maintenance not reflected in the Planned Maintenance Schedule so long as such Planned Maintenance is scheduled to be performed outside of Daylight Hours or during Daylight Hours during the months of October and November and Seller provides Buyer at least two (2) weeks’ prior written notice of such Planned Maintenance; provided further that Buyer shall have the right to advise Seller of periods when Buyer prefers, based on solar irradiance, supply, market and other conditions, that any Major Planned Maintenance be deferred, and Seller shall use Commercially Reasonable Efforts to comply with such request. (d) Seller shall use Commercially Reasonable Efforts to complete any Planned Maintenance and place the Facility back into full commercial operation as soon as reasonably possible. If Seller determines that any Planned Maintenance scheduled in an agreed Planned Maintenance Schedule no longer needs to be completed or will not consume the entire time scheduled therefor in the agreed Planned Maintenance Schedule, Seller shall provide (i) a Generation Forecast to Buyer reflecting the forecasted amount of Delivered Energy during each affected interval that takes into account such change and (ii) in the case of any Major Planned Maintenance, a written notice declaring the cessation and termination of the applicable Major Planned Maintenance period (in which event, the Major Planned Maintenance period shall terminate in accordance with the terms of such Generation Forecast and written notice).