Concept Drawings Clause Samples

The 'Concept Drawings' clause defines the role and status of preliminary design illustrations or sketches provided during a project. These drawings typically serve as an initial visual representation of the intended design, outlining general ideas, layouts, or features before detailed plans are developed. They are often used to communicate design intent to stakeholders and to facilitate early discussions or approvals. The core function of this clause is to clarify that concept drawings are not final construction documents, thereby managing expectations and reducing the risk of misunderstandings about the project's scope or details at an early stage.
POPULAR SAMPLE Copied 1 times
Concept Drawings. Design ideas are sketched with pencil; planting bed areas are proposed, plants are selected and hardscape designs are drawn. The plan is then computerized, estimated and prepared for presentation.
Concept Drawings. These documents shall be schematic drawings responding to the predesign documentation and architectural program requirements illustrating the general scope, scale, and relationship of project components. Documents shall include, as a minimum, the following in addition to other graphic or descriptive materials Consultant may deem necessary to adequately communicate the project: 1) A site plan showing acreage, points of the compass, scale, contours and general topographical conditions, flood plain elevation and velocity zone (pursuant to FEMA and/or Broward County criteria, whichever is most stringent), over-all dimensions, adjacent highways, roads, off-site improvements, emergency access, fire hydrants, power transmission lines, ownership and use of adjacent land, walks and paths, vehicle and bike parking areas, preliminary chiller plant/cooling tower/electrical vault locations, accessibility for the disabled, service areas, loading docks, play areas, athletic fields, bus and car loading zones, existing buildings and use, location of proposed building(s) and future additions, relocatable or temporary structures, community use buildings, phased construction, preliminary soil borings. A statement shall be included on the site plan identifying the FEMA and Broward County criteria for flood plain and velocity zone in which the project is located. The statement shall be signed and dated by the Architect or Engineer of Record. 2) Floor plans showing points of the compass, over-all dimensions, identity of each space, proposed door locations, accessibility for the disabled, room numbers, occupant load of each space, proposed passive design and low energy usage features, possible community service/use areas, mechanical and electrical rooms, any existing buildings and use, future additions, and phased construction. a. Provide life-safety plan(s) delineating the necessity for and initial decisions concerning exits, provisions for accessibility for the physically challenged, fire walls, protected corridors, smoke partitions, fire alarm systems, fire sprinkler systems, room names and numbers, and any other life-safety features relevant to the facility. Indicate those facilities, or portions thereof, that will serve as emergency shelters or which have been designed to incorporate special emergency preparedness features or equipment including a brief notation of those design features and/or equipment. b. Provide ADA plan(s) delineating the necessity for and initial decisi...
Concept Drawings. The document marked as Attachment No. 1 to the Project Description in the original OPA, titled “Concept Drawings” is hereby renumbered as Exhibit 4 and is attached hereto and incorporated herein by this reference. The construction drawings which more specifically depict the Project and expand on the Concept Drawings will be on file with the City.
Concept Drawings. Within two (2) weeks following execution of the Lease, Tenant shall submit to Landlord four (4) sets of Concept Drawings, specifying the conceptual design and configuration of the Tenant Improvements proposed to be constructed within the Premises. The Concept Drawings shall also set forth a mechanical and electrical outline specification defining the Tenant’s specific Tenant Improvements expected to be constructed within the Premises. Such drawings and outline specifications shall include sufficient information to allow Landlord’s Architect to confirm the Base Construction including the base building mechanical and electrical capacities which Landlord shall be required to provide in the Base Construction in order to accommodate Tenant’s projected needs. (i) After receipt of concept drawings, Landlord shall, within five (5) Working Days, return to Tenant one set of prints of Concept Drawings with Landlord’s suggested modifications and/or approval, which approval shall not be unreasonably withheld. Unless such action is taken, Landlord will be deemed to have accepted and approved Tenant’s Concept Drawings. (ii) If Concept Drawings are returned to Tenant with comments, but not bearing approval of Landlord, the Concept Drawings shall be revised by Tenant and resubmitted to Landlord for approval within five (5) Working Days of their receipt by Tenant and the procedure set forth above for approval by Landlord shall be repeated. Unless such action is taken, Tenant will be deemed to have accepted and approved all of Landlord’s comments on the Concept Drawings.

Related to Concept Drawings

  • The Drawings The Drawings are the graphic and pictorial portions of the Contract Documents showing the design, location and dimensions of the Work, generally including plans, elevations, sections, details, schedules and diagrams.

  • Shop Drawings All drawings, prints, diagrams, illustrations, brochures, schedules, and other data that are prepared by Developer, a subcontractor, manufacturer, supplier, or distributor, that illustrate how specific portions of the Work shall be fabricated or installed.

  • Final Working Drawings After the Final Space Plan has been approved by Landlord, Tenant shall supply the Engineers with a complete listing of standard and non-standard equipment and specifications, including, without limitation, B.T.U. calculations, electrical requirements and special electrical receptacle requirements for the Premises, to enable the Engineers and the Architect to complete the “Final Working Drawings” (as that term is defined below) in the manner as set forth below. Upon the approval of the Final Space Plan by Landlord and Tenant, Tenant shall cause the Architect and the Engineers to complete the architectural and engineering drawings for the Premises, and Architect shall compile a fully coordinated set of architectural, structural, mechanical, electrical and plumbing working drawings in a form which is complete to allow subcontractors to bid on the work, to the extent applicable, and to obtain all applicable permits (collectively, the “Final Working Drawings”) and shall submit the same to Landlord for Landlord’s approval, which approval shall not be unreasonably withheld. Tenant shall supply Landlord with four (4) hard copies and one (1) electronic copy of such Final Working Drawings. Landlord shall advise Tenant within ten (10) business days after Landlord’s receipt of the Final Working Drawings for the Premises if the same are approved, or, if the Final Working Drawings are not reasonably satisfactory or are incomplete in any respect, disapproved, in which event Landlord shall include in its notice of disapproval a reasonably detailed explanation as to which items are not satisfactory or complete and the reason(s) therefor. If Tenant is so advised that the Final Working Drawings are not satisfactory or complete, Tenant shall promptly revise the Final Working Drawings in accordance with such review and any disapproval of Landlord in connection therewith, and Landlord shall approve or disapprove the resubmitted Final Working Drawings, based upon the criteria set forth in this Section 3.3, within five (5) business days after Landlord receives such resubmitted Final Working Drawings. Such procedure shall be repeated until the Final Working Drawings are approved; provided, however, that if Landlord fails to notify Tenant of Landlord’s approval or disapproval of any iteration of the Final Working Drawings within the initial ten (10) business day review period or any subsequent five (5) business day review period for approval or disapproval thereof, Tenant shall deliver Landlord an additional notice requesting approval and if Landlord thereafter fails to respond within five (5) business days of receipt of such additional notice, Landlord will be deemed to have approved such iteration of the Final Working Drawings.

  • Working Drawings Not later than 15 business days following the approval of the TI Design Drawings by Landlord, Tenant shall cause the TI Architect to prepare and deliver to Landlord for review and comment construction plans, specifications and drawings for the Tenant Improvements (“TI Construction Drawings”), which TI Construction Drawings shall be prepared substantially in accordance with the TI Design Drawings. Tenant shall be solely responsible for ensuring that the TI Construction Drawings reflect Tenant’s requirements for the Tenant Improvements. Landlord shall deliver its written comments on the TI Construction Drawings to Tenant not later than 10 business days after Landlord’s receipt of the same; provided, however, that Landlord may not disapprove any matter that is consistent with the TI Design Drawings. Tenant and the TI Architect shall consider all such comments in good faith and shall, within 10 business days after receipt, notify Landlord how Tenant proposes to respond to such comments. Any disputes in connection with such comments shall be resolved in accordance with Section 2(d) hereof. Provided that the design reflected in the TI Construction Drawings is consistent with the TI Design Drawings, Landlord shall approve the TI Construction Drawings submitted by Tenant. Once approved by Landlord, subject to the provisions of Section 4 below, Tenant shall not materially modify the TI Construction Drawings except as may be reasonably required in connection with the issuance of the TI Permit (as defined in Section 3(a) below).

  • Approved Working Drawings The Final Working Drawings shall be approved by Landlord (the “Approved Working Drawings”) prior to the commencement of construction of the Premises by Tenant. After approval by Landlord of the Final Working Drawings, Tenant may submit the same to the appropriate municipal authorities for all applicable building permits. Tenant hereby agrees that neither Landlord nor Landlord’s consultants shall be responsible for obtaining any building permit or certificate of occupancy for the Premises and that obtaining the same shall be Tenant’s responsibility; provided, however, that Landlord shall cooperate with Tenant in executing permit applications and performing other ministerial acts reasonably necessary to enable Tenant to obtain any such permit or certificate of occupancy. No changes, modifications or alterations in the Approved Working Drawings may be made without the prior written consent of Landlord, which consent may not be unreasonably withheld.