DESIGN DOCUMENT REVIEWS Sample Clauses

DESIGN DOCUMENT REVIEWS. 2.4.1 The ▇▇▇▇ will evaluate periodically the availability of labor, materials/equipment, building systems, cost-sensitive aspects of the design; and other factors that may impact the cost estimate, GMP Proposals and/or the Construction Schedule. 2.4.2 The ▇▇▇▇ will recommend, in conjunction with the Project Team, those additional surface and subsurface investigations that, in its professional opinion, are required to provide the necessary information for the ▇▇▇▇ to construct the Project. Before initiating construction operations, the ▇▇▇▇ may request additional investigations in their GMP Proposal to improve the adequacy and completeness of the site condition information and data made available with the Construction Documents. 2.4.3 The ▇▇▇▇ will meet with the Project Team as required to review designs during their development. The ▇▇▇▇ will familiarize itself with the evolving documents through the various design phases. The ▇▇▇▇ will proactively advise the Project Team and make recommendations on factors related to construction costs, and concerns pertaining to the feasibility and practicality of any proposed means and methods, selected materials, equipment and building systems, and, labor and material availability. The ▇▇▇▇ will furthermore advise the Project Team on proposed site improvements, excavation and foundation considerations, as well as, concerns that exist with respect to coordination of the Drawings and Specifications. The ▇▇▇▇ will recommend cost effective alternatives. 2.4.4 The ▇▇▇▇ will routinely conduct constructability and bidability reviews of the Construction Documents as necessary to satisfy the needs of the Project Team. The reviews will attempt to identify all discrepancies and inconsistencies in the Construction Documents especially those related to clarity, consistency, and coordination of Work for Subcontractors and Suppliers.
DESIGN DOCUMENT REVIEWS. A. The CM/GC will evaluate periodically the availability of labor, materials/ equipment, building systems, cost-sensitive aspects of the design; and other factors that may impact the cost estimate, GMP Proposals and/or the Project Schedule. B. The CM/GC will recommend, with CITY approval, those additional surface and subsurface investigations that, in its professional opinion, are required to provide the necessary information for the CM/GC to construct the Project. C. The CM/GC will routinely conduct constructability and biddability reviews of the Drawings and Specifications as necessary to satisfy the needs of the Project Team. The reviews will identify all discrepancies and inconsistencies in the Construction Documents especially those related to clarity, consistency, and coordination of Work of Subcontractors and Suppliers.
DESIGN DOCUMENT REVIEWS. 2.4.1 The ▇▇▇▇ shall periodically evaluate the availability of labor, materials/equipment, and building systems; cost-sensitive aspects of the design; and other factors that may impact the cost estimate, GMP proposals and/or the project schedule. 2.4.2 The ▇▇▇▇ shall identify, in conjunction with the project team, those additional surface and subsurface investigations that are required to provide the necessary information for the ▇▇▇▇ to construct the project. After completion of design phase services, the ▇▇▇▇ may provide additional investigation to improve the adequacy and completeness of the site condition information and data made available with the construction documents. The ▇▇▇▇ may be responsible for the time and cost required to obtain such additional investigations, except if otherwise provided by specific additional services. 2.4.3 The ▇▇▇▇ shall meet with the project team as required to review designs during their development. The ▇▇▇▇ shall be familiar with the evolving documents through the various design phases. The ▇▇▇▇ shall proactively advise the project team and make recommendations on factors related to construction costs, and concerns pertaining to the feasibility and practicality of any proposed means and methods, selected materials, equipment and building systems, and labor and material availability. The ▇▇▇▇ shall advise the project team of proposed site improvements, excavation and foundation considerations, as well as any concerns regarding coordination of the drawings and specifications. The ▇▇▇▇ shall proactively recommend cost effective alternatives throughout the project. 2.4.4 The ▇▇▇▇ shall routinely conduct constructability and bid ability reviews of the drawings and specifications as necessary to satisfy the needs of the project team. The reviews shall attempt to identify all discrepancies and inconsistencies in the construction documents, especially those related to clarity, consistency, and coordination of work of subcontractors and suppliers.
DESIGN DOCUMENT REVIEWS. A. The CM/GC will evaluate periodically the availability of labor, materials/equipment, building systems, cost-sensitive aspects of the design; and other factors that may impact the cost estimate, GMP Proposals and/or the Project Schedule. B. The CM/GC will routinely conduct constructability and bidability reviews of the Drawings and Specifications as necessary to satisfy the needs of the Project Team. The reviews will identify all discrepancies and inconsistencies in the Construction Documents especially those related to clarity, consistency, and coordination of Work of Subcontractors and Suppliers.
DESIGN DOCUMENT REVIEWS. 2.4.1 The CM@R will evaluate periodically the availability of labor, materials/equipment, building systems, cost-sensitive aspects of the design; and other factors that may impact GMP Proposals and/or the Project Schedule and provide this information in a written report to the PM/CM. 2.4.2 The CM@R will identify, in writing and in conjunction with the Project Team, those additional surface and subsurface investigations that are required to provide the necessary information for the CM@R to construct the Project. After completion of pre-construction services, the CM@R may provide additional investigations to improve the adequacy and completeness of the site condition information and data made available with the Construction Documents. The CM@R will be responsible for the time and cost required to obtain such additional investigations, except as otherwise provided by specific Additional Services. 2.4.3 The CM@R will meet with the Project Team as required to review designs during their development. The CM@R will thoroughly familiarize itself with the evolving documents through schematic design (30%), design development (60%), construction documents (95%), and final documents (100%). The CM@R will proactively advise the Project Team and make recommendations on factors related to construction costs, and concerns pertaining to the feasibility and practicality of any proposed means and methods, selected materials, equipment and building systems, and, labor and material availability. The CM@R will also advise the Project Team on proposed site improvements, excavation and foundation considerations, as well as, concerns that exist with respect to coordination of the Drawings and Specifications. The CM@R will recommend cost effective alternatives. 2.4.4 The CM@R will conduct constructability and bidability reviews of the Drawings and Specifications at the 30%, 60%, and 95% document submittals. The reviews will attempt to identify all discrepancies and inconsistencies in the Construction Documents especially those related to clarity, consistency, and coordination of Work of Subcontractors and Suppliers.
DESIGN DOCUMENT REVIEWS. 2.5.1 The ▇▇▇▇ will evaluate periodically the availability of labor, materials/equipment, building systems, cost-sensitive aspects of the design; and other factors that may impact the cost estimate, GMP Proposals and/or the Construction Schedule. 2.5.2 The ▇▇▇▇ will recommend, obtain Owner approval, and conduct any additional surface and subsurface investigations that, in its professional opinion, are required to provide the necessary information for the ▇▇▇▇ to construct the Project. Before initiating construction operations, the ▇▇▇▇ may request additional investigations in their GMP Proposal to improve the adequacy and completeness of the site condition information and data made available with the Construction Documents. 2.5.3 The ▇▇▇▇ will meet with the Project Team as required to review designs during their development. The ▇▇▇▇ will proactively advise, justify, and implement recommendations on factors related to construction costs and concerns pertaining to the feasibility and practicality of any proposed means and methods, selected materials, equipment and building systems, and, labor and material availability. The ▇▇▇▇ will furthermore advise, justify, and implement proposed site improvements, excavation and foundation considerations, as well as, concerns that exist with respect to coordination of the Drawings and Specifications. The ▇▇▇▇ will recommend and implement cost effective alternatives, as approved by the Owner.

Related to DESIGN DOCUMENT REVIEWS

  • Design Documents Prepare and submit the following documents to the DAS - Records Management Office with a copy of the transmittal letter submitted to the respective Project Manager: 1. City/State Approved Drawings (1) Original set 2. Bid Set Drawings (1) Set BOND PAPER (marked as “ORIGINAL”) (1) Set electronic file (DWG & PDF) 3. Project Manual (1) Set hard copy & Detail Manual (1) Set electronic file

  • Document Review (a) During the Evaluation Period, Purchaser and the Licensee Parties shall have the right to review and inspect, at Purchaser’s sole cost and expense, all of the following which, to Seller’s Knowledge, are in Seller’s possession or control (collectively, the “Documents”): all existing environmental reports and studies of the Real Property, real estate tax bills, together with assessments (special or otherwise), ad valorem and personal property tax bills, covering the period of Seller’s ownership of the Property; Seller’s most current lease schedule in the form attached hereto as Exhibit F (the “Lease Schedule”); current operating statements; historical financial reports; the Leases, lease files, Service Contracts, and Licenses and Permits. Such inspections shall occur at a location selected by Seller, which may be at the office of Seller, Seller’s counsel, Seller’s property manager, at the Real Property, in an electronic “war room” or any of the above. Purchaser shall not have the right to review or inspect materials not directly related to the leasing, maintenance and/or management of the Property, including, without limitation, Seller’s internal e-mails and memoranda, financial projections, budgets, appraisals, proposals for work not actually undertaken, income tax records and similar proprietary, elective or confidential information, and engineering reports and studies. (b) Purchaser acknowledges that any and all of the Documents may be proprietary and confidential in nature and have been provided to Purchaser solely to assist Purchaser in determining the desirability of purchasing the Property. Subject only to the provisions of Article XII, Purchaser agrees not to disclose the contents of the Documents or any of the provisions, terms or conditions contained therein to any party outside of Purchaser’s organization other than its attorneys, partners, accountants, agents, consultants, lenders or investors (collectively, for purposes of this Section 5.2(b), the “Permitted Outside Parties”). Purchaser further agrees that within its organization, or as to the Permitted Outside Parties, the Documents will be disclosed and exhibited only to those persons within Purchaser’s organization or to those Permitted Outside Parties who are responsible for determining the desirability of Purchaser’s acquisition of the Property. Purchaser further acknowledges that the Documents and other information relating to the leasing arrangements between Seller and Tenants are proprietary and confidential in nature. Purchaser agrees not to divulge the contents of such Documents and other information except in strict accordance with the confidentiality standards set forth in this Section 5.2 and Article XII. In permitting Purchaser and the Permitted Outside Parties to review the Documents and other information to assist Purchaser, Seller has not waived any privilege or claim of confidentiality with respect thereto, and no third party benefits or relationships of any kind, either express or implied, have been offered, intended or created by Seller, and any such claims are expressly rejected by Seller and waived by Purchaser and the Permitted Outside Parties, for whom, by its execution of this Agreement, Purchaser is acting as an agent with regard to such waiver. (c) Purchaser acknowledges that some of the Documents may have been prepared by third parties and may have been prepared prior to Seller’s ownership of the Property. PURCHASER HEREBY ACKNOWLEDGES THAT, EXCEPT AS EXPRESSLY SET FORTH IN SECTION 8.1 BELOW, SELLER HAS NOT MADE AND DOES NOT MAKE ANY REPRESENTATION OR WARRANTY REGARDING THE TRUTH, ACCURACY OR COMPLETENESS OF THE DOCUMENTS OR THE SOURCES THEREOF. SELLER HAS NOT UNDERTAKEN ANY INDEPENDENT INVESTIGATION AS TO THE TRUTH, ACCURACY OR COMPLETENESS OF THE DOCUMENTS AND IS PROVIDING THE DOCUMENTS SOLELY AS AN ACCOMMODATION TO PURCHASER.

  • Project Review All plans, specifications, work write-ups, projected cost estimates, punch lists or other means of outlining work on a particular project will be submitted in writing to HCD for review and approval prior to bidding. HCD Construction and Rehabilitation Inspectors will review these items for compliance with new construction and/or rehabilitation standards and materials use.

  • Construction Document Phase 1.4.1 Based on the approved Design Development Documents, Guaranteed Maximum Price, coordinated models and any further adjustments in the scope or quality of the Project or in the Amount Available for the Construction Contract authorized by the Owner, the Architect/Engineer shall prepare, for approval by the Owner and review by the Construction Manager, Construction Documents consisting of Drawings, Schedules and Specifications derived from the model(s) in accordance with Owner’s written requirements setting forth in detail the requirements for construction of the Project, including, without limitation, the BIM Execution Plan and “Facility Design Guidelines”. The Plans, Drawings and Specifications for the entire Project shall be so prepared that same will call for the construction of the building and related facilities, together with its built-in permanent fixtures and equipment which will cost not more than the Guaranteed Maximum Price accepted by Owner, or the Amount Available for the Construction Contract established by Owner if no Guaranteed Maximum Price proposal has been accepted by Owner. The Architect/Engineer will be responsible for managing the design to stay within such Guaranteed Maximum Price proposal or Amount Available for the Construction Contract. The Architect/Engineer shall review the Construction Documents as they are being prepared at intervals appropriate to the progress of the Project with the Owner and Construction Manager at the Project site or other location specified by Owner in the State of Texas. The Architect/Engineer shall utilize the model(s) to support the review process during Construction Documents. The Architect/Engineer shall allow the Construction Manager to utilize the information uploaded into Owner’s PMIS to assist the Construction Manager in fulfilling its responsibilities to the Owner. 1.4.2 As a part of Construction Documents Phase, Architect/Engineer shall accomplish model coordination, aggregation and “clash detection” to remove conflicts in design between systems, structures and components. Model coordination shall occur at all reviews during the Construction Documents Phase as identified in the BIM Execution Plan. Architect/Engineer shall utilize Owner’s PMIS to accomplish model coordination and collaborate with Construction Manager in the resolution of critical clashes identified by the Construction Manager. Architect/Engineer shall demonstrate and provide written assurance to Owner that conflicts/collisions between models have been resolved. 1.4.3 The Architect/Engineer shall consult with the Owner and Construction Manager on matters such as construction phasing and scheduling, bid or proposal alternates, liquidated damages, the construction contract time period, and other construction issues appropriate for the Project. The Architect/Engineer shall assist the Owner and Construction Manager in the preparation of the necessary bidding information, bidding forms, RFP information, and RFP forms, and the Conditions of the Contract. 1.4.4 The Architect/Engineer shall assist the Owner in connection with the Owner’s responsibility and procedures for obtaining approval of all building and accessibility authorities having jurisdiction over the Project. 1.4.5 The Architect/Engineer shall provide coordination and inclusion of sequence of operations for all operable systems in the facility as defined by Owner during Design Development. 1.4.6 The Architect/Engineer shall review the Estimated Construction Cost prepared by the Construction Manager, and shall provide written comments. 1.4.7 The Architect/Engineer shall participate in a final review of the Construction Documents and model(s) with the Owner and Construction Manager at the Project location or other location specified by Owner in the State of Texas. Prior to the Owner’s approval of the Construction Documents, the Architect/Engineer shall incorporate such changes as are necessary to satisfy the Owner’s review comments. 1.4.8 The Architect/Engineer shall provide a list of all manufacturer warranties and submittals that are required by their specification. 1.4.9 Before proceeding into the Bidding and Proposal Phase, the Architect/Engineer shall obtain Owner’s written acceptance of the Construction Documents and approval of the Final Amount Available for the Construction Contract as approved by the Board of Regents.