Engineering and Procurement Clause Samples

The Engineering and Procurement clause defines the responsibilities and processes related to the design, technical planning, and acquisition of materials or equipment for a project. It typically outlines which party is responsible for preparing engineering documents, obtaining necessary approvals, and sourcing all required goods and services, often specifying timelines and quality standards. This clause ensures that both engineering and procurement activities are clearly assigned and managed, reducing the risk of delays, cost overruns, or disputes over scope and accountability.
Engineering and Procurement. The engineering and procurement component of the Company Work shall consist of the following: Following the Effective Date, the Company will determine, in its sole discretion, the set of design, engineering, and long-lead procurement work that is appropriate and practicable to undertake under this Agreement with respect to the Company’s Network Upgrade Facilities (as such term is defined below) that are covered or addressed by the System Impact Study as they are identified in the Company’s draft facility study reports.
Engineering and Procurement. The Parties shall design the Interconnection Facilities and procure the necessary equipment according to the responsibilities of each Party, as set forth in Appendix A.
Engineering and Procurement. (E&P) Agreement
Engineering and Procurement. Delta-T to be responsible for process design, procurement and detail construction engineering for the Plant, consisting of: o Process design based on proprietary Delta-T technology o Material and energy balances o Piping & Instrumentation Diagrams (P&IDs) o Plant and equipment arrangements drawings o Detailed design and engineering of custom fabricated components o Piping and equipment installation specifications o Piping layout drawings, as necessary, to facilitate piping installation o Equipment and component procurement specifications o Architectural drawings and specifications for: o Main Process Building control room, break room, laboratory, bathrooms, and MCC room o Plumbing and HVAC design drawings and specifications o Electrical design to include: o Power distribution diagrams o MCC room equipment location plans o Lighting plans o Power and lighting plans for office, lab, and control room areas o Grounding and lightning protection plans o Electrical equipment procurement specifications o Instrumentation and controls design, to include: o Instrumentation procurement specifications o Instrumentation wiring diagrams o Control system hardware and software configuration and programming with control narrative o Control, shutdown and interlock system philosophy and logic with description of the functioning systems for normal and emergency shutdowns, for normal control, for startup, etc. o Delta-T will review construction and shop drawings submitted by Owner's other engineers, contractors or vendors, if any. o One HAZOP Review, and one Owner required review for insurance or safety issues. Section 6 of the General Conditions will establish if a change order is required. o Licensed design professionals will provide stamped drawings for the Work where designated by government codes. -------------------------------------------------------------------------------- Page 38 o Convert engineering into specifications for all equipment, materials and services provided per this scope. o Procurement, delivery, unloading, and storage of all equipment and materials that are within Delta-T's scope. o Preparation of initial equipment records including drawings, installation manuals and recommended spare parts lists for all major equipment. Delta-T will assemble Maintenance Manuals for all Equipment it procures under this Agreement. These Manuals will normally consist of vendor information and drawings, but special instructions may be included where the vendor information ...
Engineering and Procurement. Agreement The requirements specified in Section 9 of NorthWestern Energy’s LGIP shall apply to any Engineering and Procurement Agreement. However, the tendered Engineering and Procurement Agreement will be a single form of agreement among all the Owners and the Interconnection Customer, and NorthWestern Energy, as the designated operator, will negotiate all applicable terms on behalf of the Owners.

Related to Engineering and Procurement

  • Procurement All goods, works and services required for the Project and to be financed out of the proceeds of the Financing shall be procured in accordance with the provisions of Section III of Schedule 2 to the Financing Agreement.

  • Training and Professional Development 11.1 The Employer will develop and maintain an employee training and development plan and provide such plan to the Union upon request. Staff training is intended to provide an opportunity for classified staff employees for training sponsored by the University Training and Development and the UW Medical Centers Organizational Development and Training. Education/Professional Leave is intended to facilitate employee access to continuing education opportunities. Training and educational/professional leave may be used for the purpose of improving job performance, maintaining and increasing proficiency, preparing staff for greater responsibility, or increasing promotional opportunities within the framework of staff positions available at the University. 11.2 Any release time for training for employees accepted for such classes shall be in accordance with the Executive Order (currently No. 52) governing this matter. In the event that two or more employees request the same training period and supervision must limit the number of persons who may participate at one time due to work requirements, the selection will be made on a mutually agreeable basis within the department. 11.3 The training program is a proper subject for discussion by either departmental or University-wide Joint Union/Management Committees. 11.4 If the Employer requires an employee to receive training, reimbursement will be provided in accordance with the University travel rules. Employee attendance at Employer required training, either during or outside working hours, will be considered time worked and compensated in accordance with the provisions of this Agreement. 11.5 Employee attendance at training not required by the Employer and not covered by Executive Order 52, either on approved leave from or outside of working hours, will be voluntary and not considered time worked.

  • Reverse Engineering The Customer must not reverse assemble or reverse compile or directly or indirectly allow or cause a third party to reverse assemble or reverse compile the whole or any part of the software or any products supplied as a part of the Licensed System.

  • Engineering Forest Service completed survey and design for Specified Roads prior to timber sale advertisement, unless otherwise shown in A8 or Purchaser survey and design are specified in A7. On those roads for which Forest Service completes the design during the contract, the design quantities shall be used as the basis for revising estimated costs stated in the Schedule of Items and adjusting Timber Sale Account. (a) A7 to show Purchaser’s performance responsibility. (b) The Schedule of Items to include costs of survey and design, as provided under B5.24, and adjust Timber Sale Account, as provided in B5.

  • Geotechnical Engineer « »« » « » « » « » « »