The "Monitor Progress" clause establishes the right or obligation for one party to track and assess the advancement of work or performance under an agreement. Typically, this clause allows for regular updates, status reports, or site visits to ensure that milestones are being met and that the project is proceeding according to schedule. Its core practical function is to provide transparency and accountability, enabling early identification of issues and ensuring that both parties remain aligned on expectations throughout the duration of the contract.
Monitor Progress. The Seller shall:- 7.2.6.1 Ensure that the Purchaser and any representatives appointed by the Purchaser, are afforded reasonable access to the Site upon giving the Seller reasonable notice provided that such access does not materially interfere with the construction works or expose any person on the Site to any danger; 7.2.6.2 Make available for inspection at the Site copies of all plans and designs, other than any proprietary information of the Seller or any sub-contractor, in relation to the construction, or any part thereof; and 7.2.6.3 Within three (3) months of the Plant commissioning date, supply the Purchaser with one(1) set of reproducible copies and two(2) sets of white print copies or equivalent of all “as built” plans and designs relating to the operation or maintenance of the Interconnection Facilities as the Purchaser may reasonably require. The Seller shall also provide to the Purchaser two (2) copies of the operation and maintenance manuals in respect of the Interconnection Facilities.
Monitor Progress. The Seller shall: a) ensure that Purchaser and any representatives appointed by Purchaser, are afforded reasonable access to the Site upon giving the Seller reasonable notice provided that such access does not materially interfere with the construction works or expose any person on the Site to unsafe conditions; b) make available for inspection at the Site copies of all plans and designs, other than any proprietary information of the Seller or any sub-contractor, in relation to the construction of any part thereof; and c) within six (6) months of the Full Commercial Operation Date, supply Purchaser with one (1) set of reproducible copies and five (5) sets of white print copies (or equivalent) of all “as built” plans and designs relating to the operation or maintenance of the Plant as Purchaser may reasonably require.
Monitor Progress. 24.18.1 The progress of each Referred Participating Teacher shall be monitored with a written PAR record and a final assessment of the Referred Participating Teacher’s progress in the PAR program. The Panel’s final assessment statement of the Referred Participating Teacher shall be forwarded to the Personnel Office to be filed in the teacher’s personnel file and shall be available to the teacher’s evaluator for consideration in preparing the teacher’s evaluation pursuant to the District teacher performance evaluation article.
Monitor Progress. If you want to implement the following measures: science camps, girls day, researchers go to school, etc. How can you demonstrate change within your organisation? For this purpose you find indicators in the tree. One possible indicator in this case is the number of women among new hired faculty. When you have implemented your measures, you can use this indicator to monitor progress. For example: in two years you can check again: how many women in total numbers and in % are among newly hired staff? The following slides show how the tables in the ▇▇▇ tool are structured. The ▇▇▇ tool contains a huge list with indicators, descriptions how to use them, the metrics and how to calculate them. Sources are also provided so that you can position your data in a broader frame or compare them to general findings.
Monitor Progress. Indicators also help to find out if there is made any progress towards targets. When you have implemented your measures, you can monitor if you are making any progress, i.e. in a year or two you can look at the indicator again and see if anything has changed. For example: in two years you can check again: how many women in total numbers and in % are among newly hired staff? Example: 1) Find out where the problem is and how severe it is:
Monitor Progress. (a) NPC shall review the basic engineering designs and plans prepared by SPCC for the Cogeneration Power Production Facility and the detailed designs of the Switchyard Facility in terms of its compliance with the prescribed standards and specifications set forth in the First Schedule; to ensure that the design and plans will not adversely affect the safe and secure operation of the grid, and shall approve the same, if found acceptable, prior to actual construction. NPC shall not unreasonably withhold such approval if design is per prescribed standards and specifications and within Internationally Accepted Engineering Standards. Any design changes by NPC outside of the prescribed standards and specifications are subject to concurrence by SPCC and, when applicable, are subject to a change in Capital Recovery Fees and in the schedule unless it is shown to SPCC's reasonable satisfaction that the safety or integrity of the grid would be compromised if such changes were not implemented. If NPC has not commented on such designs or plans within seventeen (17) Days from the date of receipt by NPC per the drawing submittal schedule agreed between NPC and SPCC, then such designs and plans shall be deemed approved. This approval by NPC notwithstanding, SPCC shall be solely responsible for the integrity of its detailed engineering designs and plans. The approval thereof by NPC does not diminish this responsibility, nor does it transfer any part of such responsibility to NPC. (b) SPCC shall allow NPC to conduct environmental audits and monitoring in accordance with the Environmental Compliance Certificate. During such audit and monitoring, NPC personnel shall be accompanied at all times by SPCC personnel, and shall be subject to Site rules and regulations. Such audits shall be limited to SPCC'S battery limits. (c) NPC shall be entitled, at its own cost, to monitor the progress and quality of the design, construction and installation work and for this purpose SPCC shall: (i) submit to NPC a monthly report (in form and content reasonably satisfactory to NPC), due within thirty (30) Days from the end of the preceding month, outlining the construction progress in such detail as is reasonable in the circumstances; (ii) ensure that NPC and any experts appointed by NPC in connection with the Project, with reasonable notice, are afforded reasonable access to the Site at times to be agreed with SPCC, provided that such access does not interfere with the work comprising the Proje...
Monitor Progress. Regularly monitor and evaluate the progress of the research project, providing constructive feedback and guidance to students.
Monitor Progress. The Seller shall: (a) ensure that KPLC and any representative appointed by KPLC are afforded reasonable access to the Early Generation Site and the Site upon giving the Seller reasonable notice provided that such access does not materially interfere with the construction works or expose any person on the Early Generation Site or the Site to any danger; (b) make available for inspection at the Early Generation Site and the Site copies of all plans and designs other than any proprietary information of the Seller or any sub-contractor in relation to the construction or any part thereof; and (c) within six months of the Early Generation Commercial Operation Date and of a Full Commercial Operation Date, supply KPLC with one set of reproducible copies and five sets of white print copies (or equivalent) of all “as built” plans and designs required for the operation and maintenance of the Early Generation Facility and the relevant Plant.
Monitor Progress. Evaluating students’ continued progress to achieve the learning outcomes and complete their program of study.
Monitor Progress. NAPOCOR shall be entitled at its own cost to monitor the progress and quality of the construction and installation work and for this purpose HOPEWELL shall: 8 12 (i) submit to NAPOCOR a quarterly report of construction progress which shall be in such detail as is reasonable in the circumstances;