Scope Exclusions. The Security Management service does not include assistance, which involves program development, coding, and isolation of coding problems or implementation assistance regardless of the cause of data loss or hardware malfunctions. Security Management does not include consulting (IT Audit, Vulnerability Assessment or Application Security). PORTIONS OF THIS AGREEMENT HAVE BEEN OMITTED PURSUANT TO A REQUEST FOR CONFIDENTIAL TREATMENT FROM THE SEC Exhibit A - Service Description
Scope Exclusions. The Powerlink Works specifically excludes the following: (i) [list exclusions]
Scope Exclusions. The following services are not included under this Agreement, and will be furnished by others or their agent, as noted: • Architectural design or site work associated with proposed facilities (i.e. architectural renderings, sketches, elevations, footings/ foundations, etc.) • As-built surveys or construction staking • Electrical or mechanical engineeringEnvironmental Site Assessment (ESA) • GDOT coordination and permitting. • Improvements to any existing public rights-of-way or utilities that may be additional requirements by the city that have not been identified elsewhere in this scope and would not exclusively serve the development. • Railroad coordination and encroachment agreements • Sanitary sewer and/or water distribution system design • Services associated with variances, waivers, modifications and/or any relief from local, state, or federal regulations. • Services related to air, solid waste, and/or hazardous waste permits. • Services related to any design changes that resulted major re-design of the accepted design development document. Any rework due to such changes will be charged at an agreed hourly rate as additional services. • Services related to noise abatement or endangered species. • Services related to rezoning or annexation of property. • Services requiring FEMA approvals such as CLOMAR; A LOMAR and ASBUILT survey. • Soft-surface Trail DesignStructural engineering and geotechnical engineeringTraffic engineering, signal design, or traffic studies and/or signal warrants • Variance or Special Use Permits for the development. • Water collections for water quality samples or submittals to NPDES for water quality monitoring reportsWetland delineation and Army Corps permitting for disturbance within jurisdictional wetlands. Task 1Surveying Services $5,760.00 Task 2 – Update 30% Schematic Design $3,500.00 Task 2 - 60% Construction Documents for LDP Submission $15,000.00 2.1 Stormwater Management and Flood Study (No-rise) $9,500.00 2.2 Landscape Plans $5,000.00 Task 3Permit Coordination (Hourly) NTE $4,000.00 Task 4 – 100% Construction Documents $8,000.00 Task 5Bid Assistance (Hourly) NTE $2,200.00 Task 6Construction Administration (Hourly)
Scope Exclusions. ➢ Surveying
Scope Exclusions. This Chapter shall not apply to measures adopted or maintained by a Party relating to [financial institutions] of another Party, investors of the other Party and to the investments of such investors, in [financial institutions] in the territory of the Party, as defined in Article X.1 (Financial Services Chapter - Definitions);
Scope Exclusions. In addition to the scope being defined as stated above the scope of this effort specifically does not include the following: • Software Installation • Training The change control process will occur as follows: • The business submits a written change request for seeking enhancements and/or new functionality. The request must include the business impact (vs. financial impact) of the proposed enhancement or functionality requested. • The Project team analyzes the cost, the business impact and schedule impact of implementing the change and submits the analysis for review. The analysis will include, at minimum: • An overview of the work necessary to implement the change; • The resource hours and cost required to do that work, if any; and • The forecast effects that implementing the change will have on the project schedule. • The Project team change committee meets to discuss and prioritize Palomar College’s standing change requests and to approve plans and costs if any for the change request implementations. • The Project Manager updates the current project plan to reflect the new requirements requested. • The Project sponsor or their designee approves the revised project plan. • The project team implements the approved changes. A successful project execution is largely due to strong management support, a focus on project objectives and limiting work to what is in scope and to the qualities, energies, skills, experience, and commitment of the individuals assigned to these projects. The success of this overall project will also depend on these same characteristics.
Scope Exclusions. The following services are not included under this Agreement, and will be furnished by others or their agent, as noted: • Additional drawings & specification revisions due to value engineeringArchitectural design or site work associated with proposed facilities (i.e. architectural renderings, sketches, elevations, footings/ foundations, etc.) • Community engagement events/meetings • Construction documents • Value Engineering • Effingham County / City of ▇▇▇▇▇▇ Land Disturbance Permit • Electrical or mechanical engineering • GDOT coordination and encroachment permit • Improvements to any existing public rights-of-way or utilities that may be additional requirements by the county that have not been identified elsewhere in this scope and would not exclusively serve the development • NPDES checklist, ES&PC Plans, review and permitting by GSWCC • Permitting related fees • Services related to rezoning or annexation of property • Services related to variances, waivers, modifications and/or any relief from local, state or federal regulations • Soft-surface Trail DesignStructural Engineering and Geotechnical Services • Surveying, Easement Plats and Legal DescriptionTraffic engineering, signal design, or traffic studies and/or signal warrants • Water collections for water quality samples or submittals to NPDES for water quality monitoring reports Task 1 – Conecptual Alignment and Fieldwork $28,530.00 Task 2 – Final Concept Design Document and Cost Estimate $31,470.00
Scope Exclusions. The following application components are excluded from the scope of this SOW. Customer may choose to implement these Project components to which Customer has subscribed at its discretion following the initial Project phase described in this SOW. Any additional scope would necessitate a separate SOW with an associated cost.
Scope Exclusions. Provider has identified the following items which will be specifically excluded from the scope of this engagement: 1) Compliance with specific security requirements from Customer or any 3rd party (including vendors, government, and industry organizations) is specialized and not a standard for this scope of work. 2) Vulnerability assessment and penetration testing will not be performed for more than 30 public IP addresses nor more than 500 internal network hosts. 3) Web application security testing will not be performed for more than 15 websites. 4) Assessments on internal infrastructure will only be launched from a single physical location; other sites not accessible through site-to-site connectivity from source location will be excluded from assessment of internal components. 5) Provider will provide no configuration services for server, network, or end-user infrastructure. CUSTOMER NAME Page 11 of 14 Last Revised 9/18/2018 DIR-TSO-4173 Appendix DService Agreement Provider will work with Customer upon execution of this Service Agreement to determine a project start date based on mutual availability of resources and scheduling constraints.