Categories of Work Sample Clauses

Categories of Work. The work most often performed under this plan is Emergency Work. This work is performed immediately to save lives, to protect property, for public health and safety, and/or to avert or lessen the threat of a major disaster. Emergency Work contains two categories: Debris Clearance (Category A) and Protective Measures (Category B). It is possible that certain types of claims may be made under Permanent Work categories. For example, certain damages or losses of facilities and equipment may fall into the Permanent Work categories.
Categories of Work. When new types of equipment or categories of work for which rates of pay are not established by this Agreement are put into use or effect, rates governing such operations shall be subject to negotiations between the parties. In the event of failure to reach agreement on such rates, the question shall be referred to arbitration and a Board of Arbitration shall be established within thirty (30) days of the date of failure to reach such an agreement and the rates as determined shall apply from the first day the equipment or categories of work were put into use or effect.
Categories of Work. The use of fixed-term employment for contracts offered on or after the date of commencement of this Agreement, shall be limited to the employment of a staff member engaged on work activity that comes within the description of one or more of the following circumstances: a) Specific Task or Project
Categories of Work. When new categories of work, for which rates of pay are not established by this Agreement, are put into effect, rates governing such categories of work shall be subject to negotiations between the parties. In the event of failure to reach agreement on such rates or on what constitutes new categories of work, the questions shall be referred to Arbitration as soon as possible.
Categories of Work. When new types of equipment or categories of work for which rates of pay are not established by this Agreement are put into use or effect, rates governing such operations shall be subject to negotiations between the parties. In the event of failure to reach agreement on such rates, the question shall be referred to arbitration and a Board of Arbitration shall be established within thirty (30) days of the date of the failure to reach such an agreement and the rates as determined shall apply from the first day the equipment or categories of work were put into use or effect. The Company agrees to provide the necessary training without loss of wages, for unfamiliar or new equipment to all seniority employees.
Categories of Work. The work to be performed at the Demised Premises is categorized as follows:
Categories of Work. (a) Unless otherwise mutually agreed to between the Company and the Union there shall be the following designated categories of work: (i) Scheduled Service including Duties and Sightseeing Tours (ii) Standby Work and On Call (iii) Charter Work (b) These categories of work must be clearly designated on a daily work board which must also be posted on a daily basis for all drivers to see. (c) The posting must indicate all work available in each category for the following day (or days) on which drivers may sign according to seniority for the following day’s work only. (d) Where possible and operationally viable, the daily work board will also be sent to e-mail addresses for those drivers who request such a posting.
Categories of Work. Pre-qualified contractors must be listed in the City of Houston’s Office of Business Opportunity directory of certified companies as a Small Business Enterprise (“SBE”), Minority Business Enterprise (“MBE”), or a Women Business Enterprise (“WBE”). The SBE, MBE, or WBE certification must be for a category in either ▇▇▇▇▇▇ ▇▇ or ▇▇▇▇▇▇ ▇▇ of the North American Industry Classification System (“NAICS”). Pre-qualified contractors in the Program will perform work in designated categories, which includes asphalt repair, concrete panel replacement, curb and gutter repair, ADA wheelchair ramps, sidewalk repairs, point repairs, restorations, small diameter waterline repairs and other related work. The specification requirements for each category can be found in the City of Houston Standard Specification Manual at ▇▇▇▇://▇▇▇▇▇.▇▇▇▇▇▇▇▇▇▇▇.▇▇▇▇▇▇▇▇▇.▇▇▇/documents/specifications/20157_standard_specifications.pdf.
Categories of Work. Establishment of Rates for Types
Categories of Work. ▇▇▇▇ ▇▇▇ – Principal Investigator, Project Manager, All aspects of project. leads and coordinates the project, will be responsible in GPCM modeling & gas market analysis; interviews, lead Part I, II and III. Garcan Gulen – Researcher participating in gas market analysis & link to power market; case studies; interviews, contributes to Part I and II, and lead Part IV. ▇▇▇▇▇▇ ▇▇▇▇▇▇▇▇▇▇▇– Researcher participating in comments on availability and any geological consideration of additional storage in Texas, contributes to Part I and II for technical consideration. ▇▇ ▇▇▇ – Researcher participating in technical consideration of operation parameters on underground gas storage (withdraw rate versus working gas level, and possibility of performance boundary of gas storage), contributes to Part I and II for technical consideration ▇▇▇▇ ▇▇▇▇▇▇ – Researcher participating in Part I and II for map illustration and data support. ▇▇▇▇ ▇▇▇▇▇▇▇ - AD providing management advising and project coordination. A graphic illustrator and editor, both employed by The University of Texas at Austin, Bureau of Economic Geology, will assist in the reporting and preparation of the technical printed material of the research project.