Basis of Estimate Clause Samples

Basis of Estimate. The estimate is based on the tasks mentioned above. Modifications to the tasks after confirmation will be deemed to be additional services and will require subsequent authorization from the Client.
Basis of Estimate. The Offeror shall provide a basis of estimate in excel spreadsheet format for each task discussed to include but not limited to team size and make up, number of teams, labor productivity/ duration, labor hours, labor categories, subcontractors, number of meetings, etc., such that the evaluators can get a clear understanding of the basis for the proposed approach. The list of equipment and materials shall be itemized in the basis of estimate to reflect the work proposed for the sample task order. The key subcontractor BOE shall not be a lump sum and shall be detailed to include team size and make up, number of teams, labor productivity/ duration, labor hours, labor categories, equipment, materials. To assist with a crosswalk for the technical and price evaluators, Offerors shall provide corresponding basis of estimate page number in the Technical Approach – Volume I, Tab 1, Element 2 to corresponding basis of estimate page number in the PriceVolume III, Tab 4. The Sample Task Order will be used for evaluation purposes only. The Sample Task Order will not be awarded.
Basis of Estimate. For Information Only
Basis of Estimate. Roadway: +/-300' total project length; 16' wide roadway [8" thick aggregate base with A-3 surface treatment (oil & chip)]; 2' earth shoulders Assumptions: 0 Private; 1 Field Entrances (assume 1 aggregate) DATE: 10-26-2021 BY: ▇▇▇▇▇ ▇. ▇▇▇▇▇▇, ▇.▇. ▇▇▇▇▇▇▇▇ Companies, LLC ▇ ▇▇▇▇▇▇▇▇▇ ▇▇▇▇▇ ▇▇▇▇▇, ▇▇ ▇▇▇▇▇ AAR / DOT 167 786G / RR MP 248.80 Phone: ▇▇▇-▇▇▇-▇▇▇▇ ▇▇▇▇ ▇▇▇▇ TWP / ▇▇▇▇▇▇ COUNTY, IL
Basis of Estimate. The cost estimate is based on the closure plans outlined in Sections B.1 to B.4. Generally if there is uncertainty in the work scope, a conservative position has been adopted (more expensive) in preparing the estimate such that further refinements in closure planning may result in lower rather than higher cost. Quantities were partly provided by LMC, while some were newly developed from “as built” drawings. A library of structural drawings showing details of buildings and facilities was prepared and studied in detail to help define the extent of closure and demolition. The primary cost estimator has been working on site for over a year and is familiar with local operators, contractor capability, logistical constraints and productivity. Labour and other costs were assumed to be current Lihir contract award rates. Equipment costs were current Lihir operating or contractor hire costs. No significant permanent new materials are required for closure so no costs were obtained from suppliers. Lihir Management Company Limited December 31, 2004 Lihir Gold Mine — Mine Closure Plan Update 2004 It is assumed as normal in the mining industry, that work will be initially carried out by LMC staff with some hire of local equipment and contractors/consultants as required. As closure proceeds, more contractors will be used and LMC staff involvement will reduce.
Basis of Estimate. The Basis of Proposal is a written explanation clarifying the assumptions and exclusions used in establishing the ▇▇▇▇▇▇ ▇▇▇▇ Park Renovation proposal dated August 26, 2020. The project consists of the Renovation of the existing ▇▇▇▇▇▇ ▇▇▇▇ Park located at ▇▇▇▇ ▇▇▇▇ ▇▇▇▇▇▇ ▇▇▇▇▇, ▇▇▇▇▇▇▇▇▇, ▇▇▇▇▇▇▇▇. The estimate is based on Permit Set drawings, dated 06/12/2020 prepared by LSG Landscape Architecture, ▇▇▇▇▇▇▇▇▇▇▇ Consultants and MTFA Architecture. Following a joint review and reconciliation, necessary modifications can be made to better serve your needs.
Basis of Estimate. The estimate is based on the tasks mentioned above. Modifications to the tasks after confirmation will be deemed to be additional services and will require subsequent authorization from the Client. Any additional meetings (including attendance at public meetings) not specifically defined in the scope of services will be at the direction of the Client or Client's representative and will be performed on an hourly fee basis. RPS could be authorized by Fort Bend County to perform such additional services under existing separate contracts. This scope of services does not include the following: • Construction Administration, Management, or Inspection Services. • Public involvement and additional meetings beyond those specifically noted in this scope. • Design services beyond those specifically stated in this scope, including revisions to plans after final submittal and approval. • Any other item not specifically listed in the Scope of Services. These services, if required, and upon agreement from the Client, will be performed as an additional service. RPS Infrastructure will commence work upon receipt of signed authorization from the client and will respond to any comments from the client in a timely manner. All invoices will be prepared monthly and are due and payable within 30 days of receipt. We appreciate the opportunity to provide this proposal and are available to answer any questions. You can call ▇▇▇▇▇▇▇▇ ▇▇▇▇▇▇▇ at 281.902.3508 or email him at ▇▇▇▇▇▇▇▇.▇▇▇▇▇▇▇@▇▇▇▇▇▇▇▇.▇▇▇. Sincerely, for RPS Infrastructure, Inc. Director, Business Development and Infrastructure ▇▇▇▇▇▇.▇▇▇▇▇@▇▇▇▇▇▇▇▇.▇▇▇ . ▇▇▇▇▇▇▇▇.▇▇▇ Page 2
Basis of Estimate. Table 3 presents estimated fuel usage during construction and commissioning activities at yards and the planned duration of activities. Jacket Construction 73 22 24 Topside Construction 157 14 48 Subsea Infrastructure Construction 7 2 15 Notes: Based on average monthly recorded data from fuel consumption within the BOS SHELF and ATA yards during 2011 and 2012 for COP. A review of fuel consumption data from the Bos Shelf yard for the ACG Phase 3 project indicated 55% of diesel use was for engines and 45% for generators. This assumption has been maintained Emissions estimates were based on the duration of operation and approximate fuel consumption associated with equipment that will be commissioned onshore which is assumed to include the main generator run for one week consuming 8 tonnes of diesel per hour for 8 hour per day and intermittently over approximately 6 months, two air compressors (assumed
Basis of Estimate. Roadway: Estimated total roadway improvement length = 340' including transitions; Roadway width = 16' + 2' earth shoulders; Roadway = Corrected profile w/Bit Matl Rd Mix and aggregate base course with Type A-3 bituminous surface treatment (oil & chip) Assumptions: One (1) Private and no (0) Field Entrances are included. Exclusions: This estimate does NOT include any RR provided and installed crossing motorist warning lights and gates or crossing track / roadway materials.
Basis of Estimate. The Offeror shall provide a basis of estimate for the field work discussed in Volume 1, Tab 1, Element 1, paragraph c) to include but not limited to team size and make up, number teams, labor productivity/ duration, equipment, materials, subcontractors, number of transects, number of meetings, number of samples, etc., such that the evaluators can get a clear understanding of the basis for the proposed approach.